Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Building data management method, management equipment, building management system and storage medium

A data management and building technology, applied in network traffic/resource management, electrical components, wireless communication, etc., can solve problems such as poor stability and slow business data processing time, reduce coupling, improve stability, and improve processing speed Effect

Active Publication Date: 2021-02-02
GREE ELECTRIC APPLIANCES INC
View PDF11 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] In the embodiment of the present invention, a building data management method, management equipment, building management system and storage medium are provided to at least solve the business data processing time in the building management system Slow, poor stability issues

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Building data management method, management equipment, building management system and storage medium
  • Building data management method, management equipment, building management system and storage medium

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0035] figure 1 A layered schematic diagram of a building management system provided by an embodiment of the present invention, the building management system includes building equipment, multiple data acquisition devices, a central node, and a server, wherein the building equipment includes displays, bus equipment, sensors, lights, switch, etc.; the data acquisition device can acquire building data from building equipment, and the building data is the data of each building equipment. The central node is provided with a data receiving module, which can receive building data from the data acquiring device. Servers can be divided into intranet servers and public network servers.

[0036] Based on the layered structure of the above-mentioned building management system, an embodiment of the present invention provides a building data management method, such as figure 2 As shown, the building data management method includes:

[0037] S101, receiving the building data collected b...

Embodiment 2

[0070] An embodiment of the present invention provides a building data management device. The building data management device includes a memory, a processor, and a computer program stored in the memory and operable on the processor;

[0071] When the computer program is executed by the processor, the steps of the building data management method described in any one of the implementation manners in the first embodiment are realized.

Embodiment 3

[0073] An embodiment of the present invention provides a computer-readable storage medium, where a building data management program is stored on the computer-readable storage medium, and when the building data management program is executed by a processor, any one of the implementation modes in Embodiment 1 can be realized Steps in the building data management method.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a building data management method, management equipment, a building management system and a storage medium. The building data management method comprises the following steps: receiving building data collected by a data acquisition device at a central node, and dividing the building data into different types of business data; according to a preset corresponding relationshipbetween the processing priorities of the service data and the wireless networks, transmitting different types of service data to a server through the central node by adopting the corresponding wireless networks. According to the method disclosed in the invention, service segmentation is realized at the central node, so that the coupling between different service data is reduced, the stability of abuilding management system is improved, the processing speed is increased, wireless network shunt transmission is realized, and the transmission speed of the service data is increased.

Description

technical field [0001] The invention relates to the field of building management, in particular to a building data management method, management equipment, a building management system and a storage medium. Background technique [0002] In recent years, smart building management systems are being widely used, and a large number of buildings are undergoing smart transformation. In the smart building management system, the data of various systems in the building need to be aggregated and transmitted to the server. At present, the data in the building is mainly directly aggregated by the central node and all data is directly transmitted to the server. However, there is a large amount of data in the building, and some unimportant data directly affects the transmission of data with higher real-time requirements. In addition, because the transmission of a large amount of data may cause problems in the central node, the central node is located in a key position of the building sy...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): H04W28/10H04W72/12G16Y10/80G16Y20/10G16Y20/20G16Y40/10G16Y40/20
CPCH04W28/10G16Y10/80G16Y20/10G16Y20/20G16Y40/10G16Y40/20H04W72/569
Inventor 魏赫轩牟桂贤康宇涛陈楚洪梁超文
Owner GREE ELECTRIC APPLIANCES INC
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products