A method for judging and predicting the main controlling factors of productivity in fracturing horizontal wells in tight oil
A technology of main control factors and horizontal wells, applied in prediction, data processing applications, instruments, etc., can solve the problems of low productivity prediction accuracy and difficult evaluation, and achieve the effect of improving evaluation accuracy, meeting production needs, and high coincidence
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0064]This embodiment relates to a method for judging and predicting the main controlling factors of the productivity of a tight oil fracturing horizontal well, including the following steps:
[0065] Step 1: For the production of fractured horizontal wells in the tight oil blocks to be studied, determine the potential influencing factors of the productivity of tight oil fractured horizontal wells from three aspects: geological factors, development factors and engineering factors;
[0066] Step 2: Clarify the internal relationship of potential influencing factors on productivity, eliminate appearance factors and overlapping factors, and establish a comprehensive evaluation system for fractured horizontal well productivity suitable for the study area;
[0067] Step 3: Obtain relevant data according to the comprehensive evaluation index system of production capacity;
[0068] Step 4: Use the gray correlation analysis method to calculate the correlation between influencing factor...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


