Equipment monitoring method, system and device

An equipment monitoring and equipment technology, applied in the field of electronic information, can solve the problems of low monitoring and management efficiency of ground measurement and control equipment, and achieve the effect of reducing manual operation, enhancing scalability, and facilitating unified management

Active Publication Date: 2022-02-25
陕西星邑空间技术有限公司
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] Embodiments of the present disclosure provide an equipment monitoring method, system, and device, which can solve the problem of low monitoring and management efficiency for ground measurement and control equipment

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Equipment monitoring method, system and device
  • Equipment monitoring method, system and device
  • Equipment monitoring method, system and device

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0059]An embodiment of the present disclosure provides an equipment monitoring system, such as figure 1 As shown, the system 10 includes: a resource management device 101 and a monitoring device 102;

[0060] The resource management device 101 is used to manage at least one monitoring device 102, and the monitoring device 102 is used to monitor at least one of the ground measurement and control equipment and the spacecraft, wherein the ground measurement and control equipment may include baseband equipment, up-converters, down-converters, attenuation instruments, spectrum analyzers, etc.

[0061] The resource management device 101 is connected to the monitoring device 102 .

[0062] The resource management device 101 is used to acquire the parameter information of the target device and the task set by the user, the target device includes at least one device in the spacecraft and ground measurement and control equipment; the task set by the user includes the spacecraft flight ...

example 1

[0071] Example 1: Generation of equipment work plan files.

[0072] The resource management device 101 generates an equipment work plan file according to the parameter information of the target equipment and the tasks set by the user. The equipment work plan file includes the corresponding target equipment and the task information that the target equipment needs to perform during the entire cycle of the spacecraft completing the mission. . It replaces the functions in the existing technology that can only partially realize fixed calibration items before tracking, fixed capture and tracking process, fixed measurement and control work, etc., and cannot realize intelligent selection or remote designated calibration items, automatic parameter changes before and during tracking, etc. Does not adapt to satellite parameter changes.

[0073] The equipment work plan file includes planning information corresponding to each target equipment, such as planning information for real-time me...

example 2

[0080] Example 2: Generation of device operation process files.

[0081] The resource management device 101 will further generate the device operation process file of the target device according to the device operation process file, and the device operation process file is used to indicate the ground measurement and control within the control range of the monitoring equipment during the entire cycle of the spacecraft completing the flight mission. Equipment and spacecraft corresponding command information.

[0082] The file contains all parameters related to the work process corresponding to the spacecraft and ground measurement and control equipment within the preset time. The resource management device 101 may complete delivery before a preset time. It can also be issued and executed at any time. When the equipment operation parameter file needs to be changed, a certain item in the file has multiple values, and a certain value needs to be temporarily changed for a certain ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The disclosure provides an equipment monitoring method, system and device, which relate to the field of electronic information technology and can solve the problem of low management efficiency of ground measurement and control. The specific technical solution is: after the resource management device obtains the parameter information of the target device and the tasks set by the user, it generates a target file, and the target file includes: a device work plan file, a device operation process file and a device operation parameter file, and the target The file is used to indicate the task information and parameter information of each lap of the target device; the resource management device sends the target file to the monitoring device; A target file generates a target command, and the monitoring device sends the target command to the target device. The disclosure is used for monitoring and management of equipment.

Description

technical field [0001] The present disclosure relates to the field of electronic information technology, and in particular to a device monitoring method, system and device. Background technique [0002] With the rapid development of aerospace technology, the monitoring and management of spacecraft has become a problem that needs to be solved. In the existing technology, ground measurement and control equipment has been configured with measurement, operation and control services for spacecraft management, but these devices need to manually apply for a week's measurement and control work plan from the measurement and control center during operation. According to this work plan, complete the task according to each lap plan. [0003] Based on the above management methods, the existing technology cannot realize the unified management of multiple ground measurement and control equipment based on different spacecraft, nor can it remotely set the parameter information and task info...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): G05B19/048
CPCG05B19/048
Inventor 王铮李骁勇
Owner 陕西星邑空间技术有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products