Construction method, system and early warning method of relay protection equipment fault early warning model
A relay protection and equipment failure technology, applied in the field of construction of relay protection equipment fault early warning model, can solve problems such as data processing dependence, equipment failure, downtime maintenance, etc., to improve stability and reliability, and reduce abnormal losses , the effect of improving the convergence speed
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0075]
[0076]
[0077]
[0078] Wherein, g(a) is a correction function.
[0079] The traditional BP neural network model uses the sigmoid function whose value range is in the [0,1] interval as the activation function, so most algorithms
[0085]
[0086]
[0089] Transfer the hidden layer data to the output layer
[0090]z
[0091]
[0094]
[0095] If E
[0097]
[0099]
[0100]
[0102]
[0103] e
[0107]c
[0108]
[0109]
[0111] Step vi: let n=n+1, go back to step ii, until the model is output in step iii.
[0114]
[0115]
[0117] During training, the convergence time under different hidden layer numbers and tolerances is as follows:
[0118]
[0119] Therefore, in the case of a single hidden layer, the allowable error range is at least 5% to 10%.
[0120] The historical data is input into the prediction model obtained by training and verified, and the results are as follows:
[0121]
[0122] There is only one identification error in the above results, and the accuracy...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


