Pouring frame fixing structure for civil construction
A technology for civil construction and fixed structure, applied in building construction, on-site preparation of building components, construction, etc., can solve problems such as cement overflow, inability to adapt to uneven ground, affecting construction operations, etc., to eliminate gaps and eliminate Effect of Cement Spill Phenomenon
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] A pouring frame fixed structure for civil construction, such as Figure 1-7 As shown, it includes a first limiting component 1, a second limiting component 2, a first fixing component 3, a second fixing component 4, a first template 5, a second template 6, a third template 7, and a fourth template 8 , the first base 9, the second base 10 and the first limit block 11; the first limit assembly 1 is in contact with the first template 5; the first limit assembly 1 is in contact with the second template 6; the first limit The component 1 is connected with the first base 9; the first limit component 1 is connected with the second base 10; the first limit component 1 is connected with the first limit block 11; the second limit component 2 is connected with the first template 5 are in contact; the second limiting assembly 2 is in contact with the second template 6; the first fixing assembly 3 is in contact with the first template 5; the first fixing assembly 3 is in contact wit...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


