[0030] A method for installing a section steel support, the method comprising the steps of:
[0031] S1. Earth excavation to the first layer of support surface and completion of pre-embedding;
[0032] S2. Pre-install the second steel support 2 on the first steel support 1;
[0033] S3. Install the first steel support 1 on the first support surface;
[0034] S4. Excavate the earthwork to the second layer of support surface and complete the pre-embedding;
[0035] S5. Lower the second steel support 2 and install the second steel support 2 on the support surface of the second layer.
[0036] Based on this method, after the earthwork is excavated to the first layer of support surface, the embedded parts are installed on the side wall of the earthwork. The second steel support 2 is pre-installed on the first steel support 1 through the connection structure, the lifting component 3 in the connection structure is installed on the first steel support 1, and the fixing component 4 ...
Embodiment 2
[0041] A connection structure supported by a section steel, comprising a hoisting assembly 3 connected to a first section steel support 1 and a fixing assembly 4 connected to a second section steel support 2, the hoisting assembly 3 is connected to the fixing assembly 4 through a pulley assembly 5, and the hoisting assembly The clamping part 31 in the assembly 3 is fixedly connected with the first steel support 1 , and the connecting part 32 connects the clamping part 31 and the hook 33 . The hanging assembly 3 can be arranged on the upper steel plate of the first steel support 1 or on the lower steel plate of the first steel support 1, and the installation position can be set according to different needs. The suspension hook 33 and the connecting portion 32 are rotatably connected. When the suspension hook 33 is connected with the pulley assembly 5, the suspension hook 33 can change along with the position of the pulley assembly 5. After the first steel support 1 is installed,...