A disposal method and technology of shield machine, applied in tunnels, tunnel lining, earthwork drilling and mining, etc., can solve the problem that shield machine is difficult to achieve safe shutdown for a long time, and achieve strict and thoughtful technical measures, scientific technical solutions, and easy implementation. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0045] Example: Long-term shutdown of the shield machine in the interval from Guanshan Avenue Station to the end point for disposal and construction
[0046] 1. Project location and scope
[0047] The second phase of the east section of Wuhan Metro Line 11: the tunnel design line between Guanshan Avenue Station and the end point. After starting from Guanshan Avenue Station, go eastward along the Gaoxin Avenue side, cross the Xiongchu Avenue Elevated and Changhang Blue Crystal International, and pass under Mingyu Road West BRT overpass, go down through the BRT overpass of Optics Valley Avenue, pass through Detao Fashion Hotel on the side, reach the intersection of Optics Valley Avenue and Gaoxin Avenue, then go southeast through Optics Valley Lujingyuan, go down through the high-voltage line tower, and pass through the underground The pipe gallery (under construction) ends at the end point (shaft).
[0048] In the section, two earth pressure balance shield machines are used to...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com