Foundation pit support dismounting and basement structure and construction method of foundation pit support dismounting and the basement structure

A technology for basements and foundation pits, which is applied in infrastructure engineering, excavation, construction, etc., can solve the problems of troublesome construction, low flexibility of use, and reduced construction economic benefits, so as to improve construction efficiency, save project costs, and improve construction economy. effect of benefit

Active Publication Date: 2021-10-26
CHINA CONSTR EIGHTH ENG DIV
View PDF11 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] Under the prior art, due to unclear steps for deep foundation pit demolition and basement structure construction, there are often unnecessary waiting procedures, the construction period of the basement structure cannot be guaranteed, and the flexibility of using the existing support structure is low, and the construction is more troublesome. Meet the needs of simultaneous construction in multiple situations, reduce the economic benefits of construction, and the stability of the support cannot meet the actual needs of use, which in turn has a certain impact on the safety of construction

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Foundation pit support dismounting and basement structure and construction method of foundation pit support dismounting and the basement structure
  • Foundation pit support dismounting and basement structure and construction method of foundation pit support dismounting and the basement structure
  • Foundation pit support dismounting and basement structure and construction method of foundation pit support dismounting and the basement structure

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0034] The technical solutions in the embodiments of the present invention will be clearly and completely described below. The embodiments of the present invention and all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0035] see figure see Figure 1 to Figure 7 , the present invention provides a technical solution: a foundation pit disassembly and basement structure, the present invention includes a supporting main frame 1, a supporting rod 2, a movable card body 4, a connecting member 10, and a locking structure 11;

[0036] The support main frame 1 is equidistantly fixedly connected with the support rod 2 through the connecting member 10, and the end of the support rod 2 is provided with a movable groove 3, and a movable card body 4 is arranged in the movable groove 3, and the movable card body 4 is circumferentially symmetrical. A fixed card slot 5 is provided, a...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a foundation pit support dismounting and a basement structure. The foundation pit support dismounting and basement structure comprises a supporting main frame, a supporting rod, a movable clamping body, a connecting component and a locking structure. According to the foundation pit support dismounting and basement structure, through the matching effect of the arranged supporting main frame, the supporting rod, the movable clamping body, the connecting component and the locking structure, a reinforced concrete truss inner support is generally selected as a deep foundation pit inner support, and after the foundation pit is excavated, the inner support is dismounted layer by layer along with the construction of the basement structure; according to a construction method of the foundation pit support dismounting and the basement structure, the stability and safety of the foundation pit are guaranteed, the construction period of the basement structure is completed on schedule, the construction efficiency is improved, the engineering cost is saved, and then the construction economic benefits are improved.

Description

technical field [0001] The invention relates to the technical field of construction engineering, in particular to a foundation pit disassembly and basement structure and a construction method thereof. Background technique [0002] The foundation pit refers to the space below the ground excavated for the construction of the foundation and basement of the building (including structures). location. [0003] Under the prior art, due to unclear steps for deep foundation pit demolition and basement structure construction, there are often unnecessary waiting procedures, the construction period of the basement structure cannot be guaranteed, and the flexibility of using the existing support structure is low, and the construction is more troublesome. It meets the needs of simultaneous construction in multiple situations, reduces the economic benefits of construction, and the stability of the support cannot meet the needs of actual use, which in turn has a certain impact on the safet...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E02D17/04E02D5/76
CPCE02D17/04E02D5/765
Inventor 张荣涛王健王大勇侯庆达许宝辉
Owner CHINA CONSTR EIGHTH ENG DIV