Bridge floor structure capable of adjusting bridge floor elevation and bridge floor elevation adjusting method
A bridge and height technology, which is applied to the bridge deck structure and bridge deck elevation adjustment with adjustable bridge deck elevation, and the field of bridge deck structure and bridge deck elevation adjustment, can solve the limitation of application scope, high risk factor, and difficult construction, etc. problems, to achieve the effect of a wide range of applications, high construction safety factor, and fast construction progress
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0043] Such as Figure 1-4As shown, a bridge deck structure with adjustable deck elevation includes a bridge deck roof system 1, an adjustable truss support system 2, a bridge deck bottom plate system 3, and a bridge deck side plate 20; the bridge deck roof system 1 includes several Bridge deck trusses 4 arranged at certain intervals in the longitudinal direction of the bridge, several bridge deck purlins 5 arranged above the bridge deck trusses 4 along the longitudinal direction of the bridge and connected to two adjacent trusses 4 , and bridge deck steel plates 6 arranged above the bridge deck purlins 5 The adjustable truss support system 2 includes a truss support vertical bar 7, a threaded support sleeve 8 on the inside, and a support bottom plate 10 with a screw rod 9; the bridge deck bottom plate system includes a shaped steel mesh 11 composed of shaped steel 19; The bridge deck side plate 20 is a steel plate, the upper edge is connected with the bridge deck steel plate ...
Embodiment 2
[0068] Different from Embodiment 1, in this embodiment, a bridge deck structure with adjustable deck elevation is applied to the Pinkuan Bridge project. The solution of this embodiment will be described in more detail below with a more specific example.
[0069] Such as Figure 5-6 As shown, in a city road upgrading and reconstruction project, a new Pinkuan bridge was built on the side of the original old bridge. The bridge width of the old bridge was 11.85m, and that of the Pinkuan bridge was 4.6m. The design vehicle load level is city-A level, and the design safety level is level one. The newly built Pinkuan Bridge adopts a bridge deck structure with adjustable deck elevation to adjust the deck elevation, which mainly includes the following steps:
[0070] Step 1. The factory assembles a bridge deck structure with adjustable deck elevation; it includes a bridge deck roof system 1, an adjustable truss support system 2, and a bridge deck floor system 3; the bridge deck roof ...