Full-life-cycle cost data management method, device and equipment based on fabricated school
A technology for full life cycle and data management, applied in the field of full life cycle cost data management, it can solve problems such as construction cost exceeding, construction cost exceeding budget, construction and maintenance cost management of non-fabricated buildings, etc. achieve the effect of management
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0058] Embodiment 1. This embodiment provides a method for managing life cycle cost data based on prefabricated schools, which is used for terminal devices. The terminal device implements the full life cycle cost data management method based on the prefabricated school by running a program.
[0059] The full life cycle cost data management method based on prefabricated schools includes:
[0060] refer to figure 1 , step S1: the terminal device obtains the construction process data, and according to the construction process data, the building construction process is divided into multiple construction stages. Mapping relations.
[0061] For example, the building construction of a prefabricated school includes prefabricated foundation construction, steel structure installation, floor and exterior wall panel installation, interior partition wall installation, and interior decoration construction stages. The construction projects included in the steel structure installation cons...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com