Unlock instant, AI-driven research and patent intelligence for your innovation.

Separating type inverted lifting equipment for suspension bridge steel beam installation and construction method of separating type inverted lifting equipment

A suspension bridge and separate technology, which is applied to the inverted lifting equipment for the steel beam installation of the separate suspension bridge and its construction field, can solve problems such as the inability to meet the steel beam erection requirements, and achieve labor and mechanical cost savings, good safety, and reliability high effect

Pending Publication Date: 2022-03-22
CCCC WUHAN HARBOR ENG DESIGN & RES +1
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the climbing capacity of the cable-mounted crane is generally less than 30°, which cannot meet the erection requirements of steel girders for suspension bridges with large span ratios

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Separating type inverted lifting equipment for suspension bridge steel beam installation and construction method of separating type inverted lifting equipment
  • Separating type inverted lifting equipment for suspension bridge steel beam installation and construction method of separating type inverted lifting equipment
  • Separating type inverted lifting equipment for suspension bridge steel beam installation and construction method of separating type inverted lifting equipment

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0049] The present invention will be described in further detail below in conjunction with the accompanying drawings, so that those skilled in the art can implement it with reference to the description.

[0050] It should be noted that the experimental methods described in the following embodiments, unless otherwise specified, are conventional methods, and the reagents and materials, if not otherwise specified, can be obtained from commercial sources; in the description of the present invention, The terms "landscape", "portrait", "top", "bottom", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", The orientation or positional relationship indicated by "inner", "outer" and so on is based on the orientation or positional relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the referred device or element must have Certain orientations...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an inverted lifting device for installation of a separated suspension bridge steel beam and a construction method thereof, the inverted lifting device comprises a plurality of inverted lifting devices, and any inverted lifting device comprises a coiling device; the lifting frame is connected with the winding device and comprises a steel strand jack; the anchor head seat and the lifting frame are arranged at intervals in the vertical direction, one end of each steel strand is fixed to the winding device, the other end of each steel strand penetrates through the lifting frame and then is fixed to the anchor head seat, and the winding device, the lifting frame and the anchor head seat jointly form a lifting system; and the beam top connecting device and the beam bottom connecting device are connected with the lifting system, the suspension bridge upper structure and the to-be-mounted steel beam correspondingly. The lifting systems, the beam top connecting devices, the beam bottom connecting devices and the like in the multiple inverted lifting devices are of a separated structure, different combination modes can be adopted for steel beam installation according to the actual construction condition, the limitation on the lifting height is reduced under the condition that the installation stability is guaranteed, and the construction efficiency is improved.

Description

technical field [0001] The invention relates to the technical field of bridge construction. More specifically, the present invention relates to an inverted lifting device for steel girder installation of a detached suspension bridge and a construction method thereof. Background technique [0002] Among various bridge structures, the suspension bridge is currently the bridge type with the strongest spanning capacity. The main girder of the suspension bridge usually includes two structural forms: steel box girder and truss type. The most common method of installing the main girder is the installation of the cable crane, followed by the installation of the floating or cable crane. When using a cable-mounted crane or a cable crane for installation, the design cycle is longer and the cost is higher; while when using a floating crane for hoisting, it is necessary to completely seal the navigation channel or reserve a navigation hole, which affects the normal navigation of the cha...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E01D21/00E01D19/00E01D11/02E01D101/30
CPCE01D21/00E01D19/00E01D11/02E01D2101/30
Inventor 张超郭强李晓峰刘益平游川胥奇李海方王炜李立威孙灿李清华王恒珂余龙飞胡琦吴睿李阳周霞盛超杰张伟建薛帆严巨新
Owner CCCC WUHAN HARBOR ENG DESIGN & RES