Manufacturing method and creep shear test method of mud-containing interlayer rock joint sample
A technology of shear test and rock joint, applied in the field of rock mechanics
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0022] Step 1: Collect the tombs sample, weigh some broken mud samples, weigh the drying box after weigh the drying box, then dry after 24 h, then weigh, depending on the obtained difference, the water mud sample content, example The water content is 16%, and then a portion of the sample was dried at 105 degrees. After drying, the XRD test was dried, and the test results were shown in the following table, and the content of clay minerals and water content considered to be needed according to the test results. Containing mud sandwich for water preservation measures, and calibrate the mud layer thickness of the load required by the test, the height of the tester is measured, the height is 100.5mm, first cover the mud layer in the structural surface to clamp the test block The layer can be extruded as a standard, which will then load the load for force by the test, which is preloaded by 20 kN-100 kN to use a variable angle shear. After loading, measure the height of 102.8 mm, calcula...
Embodiment 2
[0032] Step 1: Collect the tombs sample, weigh some broken mud samples, weigh the drying box after weigh the drying box, then dry after 24 h, then weigh, depending on the obtained difference, the water mud sample content, example The aqueous content is 16%, and then a portion of the sample is dried at 105 degrees. After drying, the XRD test is dried. According to the test results, it is considered that the mud interferring measures need to be placed, and the load required by the test required The layer thickness is calibrated, and the height of the tester is measured, the height is 100.5mm, first covering the mud layer in the structural surface to clamp the mud layer to be extruded into the standard, and then use the test required to load the load Here, the 20kN-100KN is selected for the test piece to prepare the test piece to prepare in a variable angle shear. After loading, the height is 102.8 mm, and the difference is calculated, and the thickness of less than 2.3mm is describe...
Embodiment 3
[0040] Step 1: Collect the tombs sample, weigh some broken mud samples, weigh the drying box after weigh the drying box, then dry after 24 h, then weigh, depending on the obtained difference, the water mud sample content, example The aqueous content is 16%, and then a portion of the sample is dried at 105 degrees. After drying, the XRD test is dried. According to the test results, it is considered that the mud interferring measures need to be placed, and the load required by the test required The thickness of the layer is calibrated, and the height of the tester is measured, the height is 100.5 mm, first cover the mud layer in the structural surface to clamp the mud layer to clamp the mud layer to be extruded out, and then use the test desired load method Force, the 20KN-100KN is selected for preloading the test piece using a variable angle shear. After loading, the height is 102.8 mm, and the difference is calculated, and it is 2.3mm, which will be less than 2.3mm mud layer thick...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Height | aaaaa | aaaaa |
| Thickness | aaaaa | aaaaa |
| Thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 


