Software-defined industrial field intelligent scheduling method
An intelligent scheduling and industrial field technology, applied in the direction of comprehensive factory control, comprehensive factory control, control/regulation system, etc., can solve the problems of high maintenance and adjustment costs, unsatisfactory flexible production, and difficult debugging, so as to save hardware costs and management cost, solve the difficulty of automatic maintenance, and eliminate the effects of wiring troubles
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] like figure 1 Shown: the software-defined industrial field intelligent scheduling method of the present embodiment, comprises the following steps:
[0033] Step 1: In the software configuration stage, use the protocol to connect to the field device;
[0034] Step 2: Set intelligent scheduling rules;
[0035] Step 3: regularly collect data of each device for field devices;
[0036] Step 4: Monitor the data of each device according to the set intelligent scheduling rules;
[0037] Step 5: When the device data meets the scheduling rules, trigger the device control logic;
[0038] Step 6: Run the control logic of the device, and send the device control command to the set device;
[0039] Step 7: Generate the running log of the smart scheduling rule.
[0040] In this embodiment, the smart scheduling rules in step 2 are determined by the requirements of on-site logical scheduling, where the requirements of logical scheduling are mainly the usage methods and frequency of ...
Embodiment 2
[0053] On the basis of Embodiment 1, it also includes the trigger control logic of step 5 applying the scene scheduling rule in a small workstation, which is composed of a CNC machine tool with a loading robot and a blanking robot. When the CNC machine tool The output signal of the material status signal through the RJ45 port (the data variable is 1_3_0) is 0 (representing no material), and the working status signal of the loading robot is also output through the RJ45 port (the data variable is 2_3_0) is 0 (representing the idle state) , at this time, the scheduling system writes data 1 (1: robot feeding action) to the robot feeding action signal (the data variable is 2_2_1), and the robot starts the feeding action.
[0054] The output signal of the material state signal of the CNC machine tool through the RJ45 port is (the data variable is 1_3_0) 0 (representing no material), and the working state signal of the loading robot is also output through the RJ45 port (the data varia...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
