Device for marking central axis of arch rib of concrete-filled steel tube arch bridge
A technology of steel pipe concrete and marking devices, which is applied in the direction of measuring devices, bridges, bridge construction, etc., to achieve the effects of speeding up efficiency, good application value, and precise construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0017] In order to make the objectives, technical solutions and advantages of the present invention clearer, the present invention will be described in further detail below with reference to the accompanying drawings and preferred embodiments. It is to be understood, however, that many of the details set forth in the specification are merely provided to provide the reader with a thorough understanding of one or more aspects of the invention, which aspects of the invention may be practiced without these specific details.
[0018] like Figure 1-3 As shown in the figure, a CFST arch bridge arch rib central axis marking device includes a vertical horizontal bubble device 1, a horizontal bubble device 2, a midpoint indicator 3 and a corresponding steel tube radius arc clamp device 4, and the midpoint indicator 3 is arranged at Corresponding to the middle position of the front end of the steel pipe radius arc clamp device 4, the horizontal bubble device 2 is horizontally arranged a...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


