Data transfer control method between blast furnace feeding system and blast furnace cloth system
A technology of feeding system and material distributing system, which is applied in the direction of electrical program control, program control in sequence/logic controller, clock and funnel arrangement, etc., can solve the problems of large adverse impact on blast furnace production and complicated adjustment process, and achieve The effect of simplifying the furnace top cloth distribution control system, improving stability, ensuring stability and operating flexibility
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0022] Such as figure 1 As shown, the process method usually used in large-scale bell-less blast furnaces is a batch of coke "C", a batch of ore "O", or a batch of ore "O" and a batch of coke "C". It is composed of sintering, pellets and lump ore, etc. The charging system is O↓C↓ or C↓O↓. A batch of ore and a batch of coke are loaded on the top of the furnace to form a large batch (Charge), which goes round and round. For a 2,000 cubic meter blast furnace, the batch weight of the charge is: coke batch weight 17.5t, ore batch weight 83.3t. Under normal circumstances, 7 to 8 batches of material (Charge) per hour. After each batch of coke / ore reaches the top of the furnace, the different components of the material batch are put into the blast furnace body from the distribution chute according to the corresponding distribution method. The composition of the material batch is controlled by the batching parameters, and the distribution method is controlled by the furnace top dist...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 