Method for fixation of underground storage (stock) gas well unit conjunction
A fixing method and gas storage well technology, applied to underwater structures, water conservancy projects, artificial islands, etc., to avoid losses, solve potential safety hazards, and achieve obvious effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0017] B. Lay steel bars between each gas storage well unit, and fix the reinforcement mesh layer 4 parallel to each other on the gas storage well casing 2 that is sheathed on the outer periphery of the gas storage well pipe 1, generally by welding;
[0018] C. After fixing the reinforcement mesh layer 4, pour the mixed concrete 5 into the space around the casing 2 of the gas storage well and the space between the reinforcement mesh layer 4 for pouring and filling. After it solidifies, the well is ready for cementing.
[0019] In the above-mentioned step B, a plurality of hoops 3 are arranged at equal intervals on the outer circumference of the casing 2 of the gas storage well for reinforcement. The casing 2 of the gas storage well is directly connected with the reinforced concrete by the hoop 3 .
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


