A technology of unit load and scheduling strategy, applied in the direction of single-network parallel feeding arrangement, etc., can solve the problems of large useless power, large load increase space, and increased power consumption of the plant, so as to reduce the power consumption rate of the plant and improve economic efficiency Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0023] The technical scheme of the present invention is further described below, so that those skilled in the art can better understand the technical scheme of the present invention:
[0024] Unit load scheduling strategy, the power plant obtains the AGC command from the power grid dispatching real-time control system, and then performs the following scheduling according to the load of each unit of the power plant:
[0025] 1) Real-time calculation of the difference e(k) between the AGC command and the target unit load feedback, the calculation step size is k, and the difference between e(k) and e(k-1) is calculated as Δe(k) to determine the load It is convenient to determine whether the target unit will switch to control other units after the load is increased to the load breakpoint. If the current load is falling, it is necessary to determine whether to switch to control other units; and then:
[0026] 2) If e(k) is less than the upper limit of the set error, that is to say,...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com