A technology for high-rise buildings and buildings is applied in the field of righting of the collapsed building of the 7# building in Lianhua Riverside Jingyuan, Luoyang Road, Shanghai, to achieve the effect of simple design, rapid construction and low cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0010] 1. Dig a pit 15 meters underground at the dotted line in the attached drawing of the collapsed building; 2. Use jacks on the top of the collapsed building to raise the roof of the collapsed building by 1 meter; Closed; 4. Irrigate water in the room space on the ground floor; 5. Irrigate water layer by layer on the 2nd to 5th floors; due to the weight of the water, the 1st to 5th floors of the building can be plunged into a 15-meter pit, and then find the location of the house Correct the deviation peacefully, then open the closed part of the window, and pour cement concrete into the room space.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com