Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

5 results about "Fifth floor" patented technology

housing

ActiveJP1827666SFifth floorClassical mechanics
This property is a five-story house. The front of the house has balconies from the second to the fifth floor. The left side of each balcony is covered by a wing wall that runs along the left edge of the front exterior wall and extends from the first to the fifth floor. Furthermore, a handrail wall is provided on the right side of the balcony beyond the portion covered by the wing wall.
Owner:MISAWA HOMES CO LTD

Prefabricated cabin convenient to transport and install

The utility model discloses a prefabricated cabin convenient to transport and install, belongs to the technical field of prefabricated cabins, aims at solving the problems that in the prior art, a prefabricated cabin occupies a large space during transportation and the transportation efficiency is reduced, and comprises a first floor, a first wall plate, a second floor, a second wall plate, a third floor, a fourth floor, a fifth floor and a sixth floor, the second floor is hinged to one side of the first floor, the top face of the first floor and the top face of the second floor are each provided with two inserting holes, the top face of the first floor is provided with two second wallboards which are symmetrically distributed, and the top face of the second floor is provided with a third wallboard and a fourth wallboard; through cooperation of the first wall plate, the first floor, the second floor, the second wall plate and the first limiting assembly, the folding function of the prefabricated cabin is achieved, so that the space occupied by transportation of the prefabricated cabin is enlarged, the transportation efficiency of the prefabricated cabin is improved, and through cooperation of the top cover and the second limiting assembly, the space occupied by transportation of the prefabricated cabin is reduced. Therefore, connection between the top cover and the wall body is more convenient, and the operation efficiency of workers is improved.
Owner:HUNAN CHUTIAN ELECTRICAL IND

housing

ActiveJP1827669SSurface finishFifth floor
This property is a five-story house. The front of the house has balconies from the second to the fifth floor. The surface finish of the exterior walls forming the top, bottom, left, and right edges of the front balcony section, as well as the surface finish of the exterior walls forming the left and right sides, is spray-painted. In other words, the spray-painted exterior walls form a frame-like structure on the front of the house, appearing as if they are picture frames. Furthermore, from the second to the fifth floor, there are handrail walls that are thinner than the exterior walls forming the frame, creating a step between these exterior walls and the handrail walls corresponding to the difference in thickness. The surface finish of the handrail walls is also spray-painted, similar to the surface finish of the exterior walls forming the frame.
Owner:MISAWA HOMES CO LTD

housing

ActiveJP1827667SFifth floorMechanical engineering
This property is a five-story house. Balconies are provided on the front of the house from the second to the fifth floor. The exterior walls forming the top, bottom, left, and right edges of the front balcony section are tiled, as are the exterior walls forming the left and right sides. In other words, the tiled exterior walls form a frame-like structure on the front of the house, appearing as if they were picture frames. Furthermore, glass railings are provided on the front of the balconies from the second to the fourth floors, and a U-shaped glass railing is provided on the fifth-floor balcony. Openings are formed in the exterior walls forming the left and right sides of each balcony from the second to the fourth floor.
Owner:MISAWA HOMES CO LTD

Construction method for rapid start of super high-rise building ground structure

ActiveCN118327151BFifth floorFloor slab
The application relates to a rapid starting construction method for super-high building ground structures, which comprises the following steps: firstly, after the zero elevation of the first floor ground is determined, the outer frame and the core tube are simultaneously constructed; when the outer frame and the core tube are simultaneously constructed to the third floor, a pre-pouring platform is poured outside the core tube; after the pouring is completed, the core tube is continuously constructed, and the floor slab of the third floor of the outer frame is poured; after the core tube is constructed to the fifth floor, the vertical structure of the core tube is constructed; finally, after the core tube and the outer frame are separated by a certain number of layers, the horizontal structure of the outer frame and the horizontal structure of the core tube are constructed. According to the principle that the core tube is constructed first, the steel structure frame is constructed second, and the horizontal structure is constructed last, the problem of rapid starting construction of the ground structure is effectively solved, the rapid starting of the core tube is realized, the installation of the climbing formwork frame is realized in advance, the construction period is shortened compared with the traditional construction method, and the phenomenon of the outer frame being idle is reduced to a certain extent.
Owner:SHANGHAI BAOYE GRP CORP