Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

30 results about "Fifth floor" patented technology

Quinolone antibiotic degrading bacterium and application thereof

The invention discloses a quinolone antibiotic degrading bacterium and application thereof and belongs to the technical field of biological treatment of environmental pollutants. The degrading bacterium is obtained by domestication and purification of livestock manure, and is named as Ochrobactrum sp. JOB, and was preserved in Guangdong Microbiological Culture Collection Center (GDMCC), Guangdong Province Institute of Microbiology on the fifth floor, No.59 Building, No.100 Courtyard, Xianlie Middle Road, Guanzhou City on December 21st, 2016, with a preservation number of GDMCC NO:60132. The degrading bacterium disclosed by the invention is prepared into bacterium suspension or an immobilized microbial agent which can be used for effectively removing quinolone antibiotic pollution in different environmental media such as a water body and soil; compared with a physical absorption method, a chemical degradation method and the like, the quinolone antibiotic degrading bacterium has the advantages of high efficiency, energy conservation, environment friendliness and the like; particularly, a bacterial body is immobilized by using an embedding agent, so that the life of the bacterial body is prolonged; the microbial agent has an excellent action effect and high ability of adaptation to environment.
Owner:JINAN UNIVERSITY

Construction method of suspension type steel-structured lighting skylight

ActiveCN105625645AAvoid the problem that the weight is too large and cannot be hoisted as a wholeReduce the amount of construction workSky-lights/domesBuilding material handlingFifth floorSupporting system
The invention discloses a construction method of a suspension type steel-structured lighting skylight. The construction method comprises the following steps: (1) assembling a lighting skylight steel structure, wherein the lighting skylight steel structure comprises a steel-structured net frame and a pre-stress truss supported on the lower surface of the steel-structured net frame; (2) carrying out first time of pre-stress tensioning on a pre-stress inhaul cable of the pre-stress truss; (3) hoisting the whole body of the lighting skylight steel structure to a pre-set height and suspending the lighting skylight steel structure on a supporting structure; (4) tensioning the a pre-stress inhaul cable of the pre-stress truss to a designed value. The steel-structured net frame is assembled module by module through adopting a horizontal slippage and jacking manner, the problem that the steel-structured net frame has relatively great weight and cannot be wholly hoisted can be avoided. By adopting a modularized assembling method, construction procedures also can be arranged by adopting a flow line manner, so that the construction time is saved. Each strip-shaped unit is assembled on the surface of a fifth floor, so that the construction engineering quantity of a supporting system and an operation platform is obviously reduced.
Owner:CHINA CONSTR EIGHT ENG DIV CORP LTD

Seven-floor full-compound duplex apartment with independent entrance for ground floor of each house type

InactiveCN106437202AGood sense of belongingDwelling buildingFifth floorStructural engineering
The invention discloses a seven-floor full-compound duplex apartment with an independent entrance for the ground floor of each house type. The seven-floor full-compound duplex apartment comprises compound mirror image house types A and A' with the first floor skipping to the second floor, compound mirror image house types B and B' with the third floor skipping to the fourth floor, and compound mirror image house types C and C' with the fifth floor skipping to the seventh floor; a first entrance hallway is arranged at the east side of the ground floor of the house type A on the first layer of a floor, and entrance hallways of the house types B and C are arranged side by side on the north side of the first floor of the house type A in an east-west direction; an entrance passageway of a third entrance hallway of the house type B faces east, and a third private elevator is arranged in the third entrance hallway, and stops at the underground floors, the ground floor, the third floor and the fourth floor; and the entrance passageway of a fifth entrance hallway of the house type C faces north, and a fifth private elevator is arranged in the fifth entrance hallway and stops at the underground floors, the ground floor, the fifth floor, the six floor and the seventh floor. Each house type of the seven-floor full-compound duplex apartment disclosed by the invention has an independent courtyard, an entrance hallway and a vertical traffic system which are independent of one another, so that each house type has more exalted feelings and better privacy feelings.
Owner:筑博设计股份有限公司 +1

Tunnel ventilation vertical shaft wellbore construction device and method

A tunnel ventilation vertical shaft wellbore construction device is composed of a vertical shaft construction device body and a middle partition plate construction device body. The vertical shaft wellbore construction device body is an umbrella-shaped drilling rig rock drilling machine; the middle partition plate construction device body comprises a construction hanging scaffold and a formwork; construction of a wellbore middle partition plate adopts the fabricated formwork; the middle partition plate construction hanging scaffold is a six-layer hanging scaffold, wherein a first-layer hangingscaffold body and a second-layer hanging scaffold body are double-layer hanging scaffold body of an integral structure, and a third-layer hanging scaffold body, a fourth-layer hanging scaffold body, afifth-layer hanging scaffold body and a sixth-layer hanging scaffold body are each a split-type symmetric-crescent-shaped temporary hanging scaffold body; the first-layer hanging scaffold body and the second-layer hanging scaffold body are provided with fully-closed guardrails and skirting boards; folding hinges for facilitating erecting of the formwork are arranged at the positions, adjacent tothe partition plates, of the third-layer hanging scaffold body, the fourth-layer hanging scaffold body, the fifth-layer hanging scaffold body and the sixth-layer hanging scaffold body; guardrails andskirting boards are arranged at the positions, close to the wellbore, of the third-layer hanging scaffold body, the fourth-layer hanging scaffold body, the fifth-layer hanging scaffold body and the sixth-layer hanging scaffold body; middle partition plate pouring spaces are reserved in the first-layer hanging scaffold body and the second-layer hanging scaffold body; and gaps between the two crescent-shaped discs of the crescent-shaped third-layer hanging scaffold body, the crescent-shaped fourth-layer hanging scaffold body, the crescent-shaped fifth-layer hanging scaffold body and the crescent-shaped sixth-layer hanging scaffold body serve as middle partition plate pouring spaces of the third-layer hanging scaffold body, the fourth-layer hanging scaffold body, the fifth-layer hanging scaffold body and the sixth-layer hanging scaffold body.
Owner:中煤第一建设有限公司第四十九工程处

Formwork support system for large-span overhanging structure and construction method of formwork support system

The invention discloses a formwork support system for a large-span overhanging structure and a construction method of the formwork support system, and belongs to the field of building construction. The formwork support system comprises floor beam slabs and a scaffolding support, the floor beam slabs comprise a first floor beam slab, a second floor beam slab, a third floor beam slab, a fourth floor beam slab and a fifth floor beam slab, and further comprise a middle back shore, an upper inclined support and a lower inclined support. According to the formwork support system for the large-span overhanging structure and the construction method of the formwork support system, the middle back shore has the effect of adding a support point, therefore, construction requirements for the large-span overhanging structure are met, a good bearing capacity is provided, and the safety is more reliable; a gap is reserved between the upper inclined support and the lower inclined support, the two supports do not interfere with each other, the supporting effect is ensured, and the formwork support system is safer and more reliable; and the construction method is reasonable, therefore, the construction requirements for the large-span overhanging structure are met, the good bearing capacity is provided, and the safety is more reliable.
Owner:CHINA MCC17 GRP

Yacht

The invention provides a yacht which is excellent in drainage performance and comprises a hull, a main deck, a fly bridge, an inner cabin and a drainage system. The inner cabin is arranged between the main deck and the fly bridge, the fly bridge comprises a fly bridge deck, a fly bridge access and a driving station, the inner cabin is connected with the fly bridge access by stairs, the drainage system comprises under-stair water collecting grooves, a first floor drain, a second floor drain, drainage ditches, a third floor drain, a fourth floor drain, a fifth floor drain and a sixth floor drain, the under-stair water collecting grooves are arranged on the stairs, and the drainage ditches are arranged on the fly bridge and are positioned at the front of a driving cabin. The yacht has the advantages that the floor drains are arranged on both the fly bridge and the main deck, and after falling on the yacht, outdoor rainwater can be instantly drained without remaining on the yacht, flowing around the yacht or flowing into the inner cabin; the under-stair water collecting grooves are arranged on back surfaces of the stairs, and accordingly water falling on the stairs is prevented from affecting the inner cabin; and the yacht is reasonable in design, convenient to manufacture and high in practical applicability and popularization value, and the floor drains and a drainage device are positioned reasonably.
Owner:HANGZHOU SINO EAGLE YACHT

Method for eliminating influence of bleeding on surface strength of bleeding surface of GRG (Glass Fiber Reinforced Gypsum) product

InactiveCN103203797ASolve the problem of low strength of bleeding surfaceControl Thickness ErrorCeramic shaping apparatusFifth floorGlass fiber
The invention discloses a method for eliminating the influence of bleeding on the surface strength of a bleeding surface of a GRG (Glass Fiber Reinforced Gypsum) product. The method comprises the following steps of marking a corresponding contour line on the side wall of a mold cavity of a mold according to the gypsum board thickness value of the GRG product, wherein the vertical distance from any point of the contour line to the bottom of the mold cavity is equal to the gypsum board thickness value; arranging a plurality of bleeding water drainage holes on the contour line or slightly above the contour line; then arranging an embedded part at the bleeding water drainage holes; laying five layers of gypsum plaster and glass fiber felts in the mold cavity in layers; drawing the embedded part out after a reinforcing edge is prepared; after laying the fifth layer of gypsum plaster, erecting a shaping board at the upper edge of the side wall of the mold to smear towards the same direction or smear back and forth; then laying the fifth layer of glass fiber felt on the layer of gypsum plaster; and smearing again by using the shaping board along the upper edge of the side wall of the mold before the gypsum plaster is pre-hardened. According to the method, the problem of low strength of the bleeding surface caused by bleeding can be solved, the gypsum board thickness can be controlled, and the damage to the strength of the gypsum product caused by punching after the hardening of the gypsum product is avoided.
Owner:SHANGHAI CHUNCUI DECORATION MATERIAL

Construction method of hanging steel structure daylighting skylight

ActiveCN105625645BAvoid the problem that the weight is too large and cannot be hoisted as a wholeReduce the amount of construction workSky-lights/domesBuilding material handlingSupporting systemFifth floor
The invention discloses a construction method of a suspension type steel-structured lighting skylight. The construction method comprises the following steps: (1) assembling a lighting skylight steel structure, wherein the lighting skylight steel structure comprises a steel-structured net frame and a pre-stress truss supported on the lower surface of the steel-structured net frame; (2) carrying out first time of pre-stress tensioning on a pre-stress inhaul cable of the pre-stress truss; (3) hoisting the whole body of the lighting skylight steel structure to a pre-set height and suspending the lighting skylight steel structure on a supporting structure; (4) tensioning the a pre-stress inhaul cable of the pre-stress truss to a designed value. The steel-structured net frame is assembled module by module through adopting a horizontal slippage and jacking manner, the problem that the steel-structured net frame has relatively great weight and cannot be wholly hoisted can be avoided. By adopting a modularized assembling method, construction procedures also can be arranged by adopting a flow line manner, so that the construction time is saved. Each strip-shaped unit is assembled on the surface of a fifth floor, so that the construction engineering quantity of a supporting system and an operation platform is obviously reduced.
Owner:CHINA CONSTR EIGHT ENG DIV CORP LTD

Copper matte powder preparation and conveying equipment and factory building integrated configuration system

The invention provides copper matte powder preparation and conveying equipment and a factory building integrated configuration system. The equipment comprises a mill, a dust pre-collector, a dust collector, an exhaust fan, a hot blast heater, an exhaust funnel, a top bin, a first conveyor, a second conveyor, a quantitative feeding device, a metallurgical furnace, a distributor, a controller, a first crane and a second crane; the equipment is arranged in a factory building, and the factory building comprises a mainspan factory building and an attached-span factory building, the mainspan factorybuilding comprises five floors, the first floor is located at the bottommost, and a roof is arranged above the fifth floor; the attached-span factory building comprises two floors and located on onetransverse side of the mainspan factory building, the first floor is located at the bottommost, and a roof is arranged above the second floor. The equipment is reasonably distributed in the appropriate position of the factory building, and copper matte powder can be subjected to powder grinding, drying and conveying continuously; meanwhile, the equipment occupies a small area, and is low in investment, energy-saving, low in operating cost and particularly suitable for technical transformation of smelting plant with scarcity of land resources as wells as conventional smelting plants.
Owner:CHINA NERIN ENG

Frustum-shaped building scaffold construction method

The invention provides a frustum-shaped building scaffold construction method. The frustum-shaped building scaffold construction method comprises the steps that after a fourth layer of roof is pouredand solidified, a scaffold is integrally lifted by a first preset height; a wall-attached steel beam is mounted on the fourth layer of roof and connected with the scaffold; the scaffold is lifted by asecond preset height, so that the bottom end of the scaffold can be flush with a first layer of roof; the upper end of the scaffold is driven to deflect towards a building wall body by a first presetdistance by taking a wall-attached steel beam of a third layer of roof as a fulcrum; and the lower end of the scaffold is driven to deflect towards the building wall body by a second preset distanceby taking the wall-attached steel beam of the fourth layer of roof as a fulcrum, and the scaffold returns to the vertical state, so that the distance between the scaffold and a fifth layer of roof tobe poured can meet the construction requirement. Therefore, the distance between the scaffold and the to-be-poured roof can be transversely adjusted according to the area change of each layer of roofof the building, and the construction requirement of a frustum-shaped building structure is met.
Owner:SHAANXI KAIYOU BUILDING ENG TECH

A Speech Annotation Method for Chinese Speech Emotion Database Combined with Electroglottogram

The invention provides a voice labeling method of a Chinese voice emotion database combined with an electroglottogram. The main marking content of this voice marking method includes marking eight layers of information for each voice at the same time: the first layer, the text conversion layer, clearly defines the speaker's speech content and the corresponding paralinguistic information; the second layer, the syllable layer, marks each syllable The regular pinyin and tone; the third layer, the layer of consonants and finals, marks the consonants and finals of the syllable layer separately, and at the same time marks the tone information; the fourth layer, the layer of unvoiced and voiced sounds and mutes, combined with the electroglottogram to carry out voiceless and muted sounds Segmentation; the fifth layer, the paralinguistic information layer, marks the paralinguistic information contained in each voice; the sixth layer, the emotional layer, according to the emotional state expressed by the speaker, each voice is marked with seven kinds of emotional information and marked with each The degree of expression of each emotion; the seventh layer, the stress index layer, marks the strength information of each syllable pronunciation; the eighth layer, the sentence function layer, marks the sentence type of each sentence.
Owner:BEIHANG UNIV

Method for eliminating influence of bleeding on surface strength of bleeding surface of GRG (Glass Fiber Reinforced Gypsum) product

InactiveCN103203797BSolve the problem of low strength of bleeding surfaceControl Thickness ErrorCeramic shaping apparatusFifth floorGlass fiber
The invention discloses a method for eliminating the influence of bleeding on the surface strength of a bleeding surface of a GRG (Glass Fiber Reinforced Gypsum) product. The method comprises the following steps of marking a corresponding contour line on the side wall of a mold cavity of a mold according to the gypsum board thickness value of the GRG product, wherein the vertical distance from any point of the contour line to the bottom of the mold cavity is equal to the gypsum board thickness value; arranging a plurality of bleeding water drainage holes on the contour line or slightly above the contour line; then arranging an embedded part at the bleeding water drainage holes; laying five layers of gypsum plaster and glass fiber felts in the mold cavity in layers; drawing the embedded part out after a reinforcing edge is prepared; after laying the fifth layer of gypsum plaster, erecting a shaping board at the upper edge of the side wall of the mold to smear towards the same direction or smear back and forth; then laying the fifth layer of glass fiber felt on the layer of gypsum plaster; and smearing again by using the shaping board along the upper edge of the side wall of the mold before the gypsum plaster is pre-hardened. According to the method, the problem of low strength of the bleeding surface caused by bleeding can be solved, the gypsum board thickness can be controlled, and the damage to the strength of the gypsum product caused by punching after the hardening of the gypsum product is avoided.
Owner:SHANGHAI CHUNCUI DECORATION MATERIAL

Yacht

The invention provides a yacht which is excellent in drainage performance and comprises a hull, a main deck, a fly bridge, an inner cabin and a drainage system. The inner cabin is arranged between the main deck and the fly bridge, the fly bridge comprises a fly bridge deck, a fly bridge access and a driving station, the inner cabin is connected with the fly bridge access by stairs, the drainage system comprises under-stair water collecting grooves, a first floor drain, a second floor drain, drainage ditches, a third floor drain, a fourth floor drain, a fifth floor drain and a sixth floor drain, the under-stair water collecting grooves are arranged on the stairs, and the drainage ditches are arranged on the fly bridge and are positioned at the front of a driving cabin. The yacht has the advantages that the floor drains are arranged on both the fly bridge and the main deck, and after falling on the yacht, outdoor rainwater can be instantly drained without remaining on the yacht, flowing around the yacht or flowing into the inner cabin; the under-stair water collecting grooves are arranged on back surfaces of the stairs, and accordingly water falling on the stairs is prevented from affecting the inner cabin; and the yacht is reasonable in design, convenient to manufacture and high in practical applicability and popularization value, and the floor drains and a drainage device are positioned reasonably.
Owner:HANGZHOU SINO EAGLE YACHT

Music leaning method for recognizing musical alphabets through staff stair method

The invention relates to a music leaning method for recognizing musical alphabets through a staff stair method. The method comprises the steps that floors and spaces of the stair method are adopted for expressing lines and spaces of a common staff, a keyboard area is divided into a B2 area, a B1 area, a T2 area, a T1 area and LX areas, and the LX areas are arranged among all the areas and comprisela and xi; a treble clef starts from the third floor, the third floor is do, the fourth door is mi, the fifth floor is so, the space between the third floor and the fourth floor is re, the space between the fourth floor and the fifth floor is fa, and the area is the T1 area; a bass clef starts from the second floor, the second floor is do, the third floor is mi, the fourth floor is so, the spacebetween the second floor and the third floor is re, the space between the third floor and the fourth floor is fa, and the area is the B1 area; meanwhile, for the bass clef, the second last line is do,the last line is mi, the first line is so, and the B2 area, the B1 area, the T2 area and the T1 area are connected together on a keyboard through the LX areas. The music leaning method is simple andeasy to understand, the music theory knowledge is conveniently learned and memorized, the treble clef and the bass clef are clearly expressed on the keyboard area, and the music score leaning method is more accurately and quickly obtained.
Owner:钢琴之眼(天津)科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products