A construction method and a grout-stop wall technology, which are applied in earthwork drilling, shaft equipment, wellbore lining, etc., can solve problems such as loss of grout-stop effect, cracking of shotcrete, time loss, etc., so as to improve construction speed and grouting effect, Save concrete costs and reduce the effect of further damage

Active Publication Date: 2010-03-10
CHINA RAILWAY NO 2 ENG GRP CO LTD +1
View PDF0 Cites 20 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The construction of the grout-stop wall not only causes a lot of time loss (need to install formwork, pour concrete and concrete curing), but also causes a lot of waste of concrete. However, the waste of a large amount of concrete is still unavoidable. At the same time, the grout pressure is too high during the grouting process, which may cause the shotcrete to crack, thus losing the grouting effect.
[0004] Moreover, for the broken rock near the structural zone, the joints are dense, the rock is in the shape of gravel and breccia, and some fracture zones are in the form of brec

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Example Embodiment

[0019] All features disclosed in this specification, or steps in all methods or processes disclosed, may be combined in any manner, except for mutually exclusive features and / or steps.

[0020] Any feature disclosed in this specification (including any appended claims, abstract and drawings), unless expressly stated otherwise, may be replaced by alternative features which are equivalent or serve a similar purpose. That is, unless expressly stated otherwise, each feature is one example only of a series of equivalent or similar features.

[0021] A composite grouting construction method for broken rock mass without a grout stop wall, the specific scheme is briefly described as follows:

[0022] 1. Construction preparation:

[0023] 1) The grout stopper and the double-channel grouting device are processed and shipped to the construction site after passing the inspection; the double-channel grouting device includes water glass pipes and cement slurry pipes, the grouting pipes are...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a fracture rock no-slurry-blocking wall compound grouting construction method. The method comprises the following steps: when carrying out grounting, firstly, pressing and injecting pure water cement slurry in an inner hole, closing water glass slurry inlet gate valve, opening the water glass slurry inlet gate valve after the heading face leaks cement slurry and simultaneously pressing and injecting double liquid slurry of cement and water glass; after the heading face does not leak the slurry or the heading face leaks double liquid slurry which is solidified and basically blocks fracturing crack, firstly stopping water-injecting glass, then stopping water-injecting slurry, and opening a pressure-relief gate valve in time. The fracture rock no-slurry-blocking wall compound grouting construction method has the beneficial effects that by normal grouting hole channels and pipelines, the double liquid slurry is pressed to carrying out consolidation to rock bodies near the heading face, simultaneously the double liquid slurry does not block the normal grouting hole channels either, thus achieving the purposes of consolidating the rock bodies near the heading face, then normally grouting single liquid slurry and forming water curtain.

Description

technical field [0001] The invention relates to a tunnel engineering construction method, in particular to a tunnel engineering grouting construction method. Background technique [0002] In subsea tunnels, river-crossing tunnels, and underground engineering construction under special geological conditions, groundwater is a major problem that plagues engineers. If groundwater cannot be effectively prevented, it will cause shutdowns or catastrophic consequences for engineering construction. In order to effectively avoid this risk, the commonly used method at present is to build a grout-stop wall (some projects use shotcrete grout-stop walls when the rock slab on the face of the face is better) before grouting. If the surrounding rock is relatively broken, build a grout-stop wall Mortar walls will be a must. [0003] The construction of the grout-stop wall not only causes a lot of time loss (need to install formwork, pour concrete and concrete curing), but also causes a lot o...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E21D11/04E21D11/10
Inventor 谢文清杨龙伟辜文凯郭伟
Owner CHINA RAILWAY NO 2 ENG GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products