Method and device for downlink scheduling
A scheduling method and process technology, applied in electrical components, wireless communication, etc., can solve problems such as being occupied and high-priority services cannot be scheduled in time.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0031] In order to ensure that high-priority services can be served in time, the present invention proposes a downlink scheduling scheme based on process preemption.
[0032] join figure 1 , which is a flow chart of the downlink scheduling method provided by the present invention, including:
[0033] S101: Obtain downlink service data of a user equipment UE;
[0034] S102: sort all the downlink service data according to the priority of the service data, and determine the high priority service data;
[0035] S103: Determine whether the UE has an idle process in the current subframe, if yes, perform S104, otherwise, perform S105;
[0036] S104: Send the high-priority service data to the UE through a downlink channel;
[0037] S105: Determine whether there is a preemptible process, if yes, execute S106; otherwise, execute S107;
[0038] S106: Put the high-priority service data in the cache corresponding to the process that can be preempted, and send it to the UE through a dow...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com