[0020] see figure 1 , figure 2 , the joint cofferdam in the present embodiment sets up the concrete anti-slide pile section 1 and the locking steel pipe pile section 2 in sections in the whole surrounding weir, and the front concrete anti-slide pile 1a and the tail section in the concrete anti-slide pile section 1 Concrete anti-slide piles 1b are respectively connected with tail locking steel pipe piles 2b and front locking steel pipe piles 2a in the locking steel pipe pile section 2 to form a closed whole surrounding weir.
[0021] Such as figure 2 As shown, in the specific implementation, the connecting structure between the concrete anti-sliding pile section 1 and the lock steel pipe pile section 2 is: the tail anti-sliding concrete 1b is equipped with a full-range steel protective casing with a steel casing lock 8 Tube 4, the steel pipe pile 2a at the corresponding position is equipped with a steel pipe pile lock 9, and the steel pipe pile lock 9 is locked and connecte...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 