Construction method for processing saline soil roadbed by separation layer
A construction method and technology of partition layer, applied in the directions of roads, roads, buildings, etc., can solve problems such as affecting the normal operation of vehicles, cracking damage, unevenness, bulging, and cracking on the road surface, so as to achieve easy control of construction quality and reduce engineering costs. cost, the effect of improving stability and service life
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0025] Example 1: In the highway project from Burqin to Karamay on National Highway 217, K227+200~K227+655, K227+747~K229+450, K315+800~K317+000 and other sections are saline soil sections; K228+ Sections 600 to K229+450 are strong sulfite saline soils with a total salt content of 3.59% to 4.88%. The surface layer 1m is weakly salt-expanded-strongly salt-expanded soil, and the groundwater depth is 0.5-1.5m; K315+800- The K317+000 section is medium (sub)sulfate saline soil with a total salt content of 0.76% to 0.86%. The surface 0.25m is weakly salt-expanded-strongly salt-expanded soil, and the groundwater depth is 1-3m; K227+200 ~K227+655, K227+747~K228+600 are weak saline soils.
[0026] Treatment measures: remove the surface saline soil of the widened part of the roadbed (the thickness of the removal depends on the condition of the saline soil), replace it with gravel soil, and set up a composite geomembrane to cover the gravel soil barrier.
[0027] The subgrade structure ...
Embodiment 2
[0033] Example 2: In the highway project from Hebuxell to Tiechanggou to Tuoli, K56+520~K56+920, K57+100~K58+140, K95+512~K95+728, K138+080~ The surfaces of K138+420, K208+460~K209+480, K210+120~K210+370, K222+170~K222+470, K225+880~K226+080 and other sections are white salted.
[0034] Treatment measures: remove the saline soil on the surface of the subgrade (the thickness of the removal depends on the condition of the saline soil), replace with gravel soil, and set up a coarse sand filter layer to cover the gravel soil barrier.
[0035] The subgrade structure layer of this section includes a 3cm thick asphalt surface layer, a 18cm thick cement stabilized sand-gravel layer, a coarse sand reverse filter layer covering the gravel soil barrier layer and the original roadbed surface layer. The cement-stabilized gravel layer contains 4-6% cement, and the cement is made of No. 32.5 ordinary Portland cement, and the rest is gravel. Among them, the gravel soil barrier layer covered ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 