Method for forming ultra-deep anchor hole in loose accumulation body and breakage rock layer
A loose accumulation, geotechnical layer technology, applied in drilling equipment and methods, earthwork drilling, automatic control system for drilling, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0015] Practical case of MSP7P8-22 hole in Yangchun New Iron and Steel 3# Landslide Treatment Project
[0016] The method for forming a hole with an ultra-deep anchor cable in a loose accumulation body and a broken rock-soil layer of the present invention, the steps are as follows:
[0017] Select 21.7m according to the geological survey report, design requirements, and the drilling conditions of the test hole 3 / min air compressor, YG-60 bolter and its supporting drilling tools.
[0018] Preparatory work before drilling: (1) The air compressor should be arranged in a flat and safe position as far as possible, and can meet the construction requirements of each platform; (2) The air supply pipe is made of galvanized aluminum pipe; Carry out debugging and positioning, raise the front of the tower by about 6cm, and adjust it to the required angle; (4) Check whether the hole pin at the lower interface of the impactor is seriously worn, whether the spring return performance of the...
Embodiment 2
[0026] Practical case of MSP5P6-25 hole in Yangchun New Iron and Steel 3# Landslide Treatment Project
[0027] The method for forming a hole with an ultra-deep anchor cable in a loose accumulation body and a broken rock-soil layer of the present invention, the steps are as follows:
[0028] Select 21.7m according to the geological survey report, design requirements, and the drilling conditions of the test hole 3 / min air compressor, YG-60 bolter and its supporting drilling tools.
[0029] Preparatory work before drilling: (1) The air compressor should be arranged in a flat and safe position as far as possible, and can meet the construction requirements of each platform; (2) The air supply pipe is made of galvanized aluminum pipe; Carry out debugging and positioning, raise the front of the tower by about 6cm, and adjust it to the required angle; (4) Check whether the hole pin at the lower interface of the impactor is seriously worn, whether the spring return performance of the...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com