Construction method of vacuum pre-pressed mortar enclosing wall
A construction method and closed wall technology, which are applied in basic structure engineering, construction, etc., to achieve the effect of simple and easy operation of the construction method, easy to popularize and use, and shorten the construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0011] The vacuum preloaded mud closed wall shall be constructed according to the following construction methods and steps.
[0012] ①. Pile driver in place: The surveyor releases the pile position, the deviation is not greater than 5cm, and uses a thin bamboo skewer (the bamboo tip is painted with red paint) as the pile position mark. Pay special attention to the pile position marks when the pile driver is shifted to prevent the thin bamboo skewers from breaking or shifting. Under the command of a special person, use the walking device at the bottom of the pile driver to move the pile driver, and use a level ruler and a positioning hammer to calibrate accurately. The pile driver must be kept horizontal so that the mixing pile driver is vertical, and the verticality deviation is not more than 1%. In order to ensure the accuracy of the pile position, positioning cards must be used, and the centering error of the pile position is not greater than 5m. The support of the pile dr...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More