Method for changing existing roadbed to tunnel without interrupting operation of railway

A subgrade and tunnel technology, applied in the direction of road, track, track maintenance, etc., can solve the problems of reducing the value of land along the railway, destroying the landscape along the surrounding railway, and inconvenient traffic on both sides of the railway, so as to alleviate the impact, eliminate noise pollution, value-enhancing effect

Active Publication Date: 2012-09-26
CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP
View PDF7 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Although these historically built railways have made indelible contributions to the prosperity of the city, with the development of the times, the railways in the main urban area, especially the railways in the form of road cuttings, divided the city into multiple plots, resulting in tension on both sides of the railway. The traffic is inconvenient, and the noise brought by the train has affected the lives of residents along the railway
In addition, there is usually a lot of garbage piled up along the railway line. If the garbage is not disposed of in time, it will damage the landscape along the surrounding railway lines, thereby reducing the value of the land along the railway line.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for changing existing roadbed to tunnel without interrupting operation of railway
  • Method for changing existing roadbed to tunnel without interrupting operation of railway
  • Method for changing existing roadbed to tunnel without interrupting operation of railway

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0020] Embodiments of the present invention will now be described with reference to the drawings, in which like reference numerals represent like elements.

[0021] Such as Figure 1-2 As shown, the method for changing the existing roadbed of the present embodiment into a tunnel without interrupting railway operation includes the following steps:

[0022] Step S1: setting the tunnel structure foundation 20 on both sides of the existing subgrade 10;

[0023] Step S2: Lay guide rails on one side of the existing road 10, and the mobile formwork trolley moves on the guide rails between the catenary columns 11 of two adjacent existing roadbeds 10 on the same side and across the existing Subgrade 10, the inner formwork is erected on the tunnel structure foundation 20;

[0024] Step S3: erecting anti-throwing nets on both sides of the inner formwork;

[0025] Step S4: erecting the outer formwork above the inner formwork, erecting structural reinforcement between the inner formwork...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a method for changing an existing roadbed to a tunnel without interrupting the operation of a railway. The method comprises the following steps of: (1) arranging tunnel structure foundations on the two sides of the existing roadbed; (2) erecting an inner formwork on the tunnel structure foundations across the existing roadbed between two adjacent contact net upright posts of the existing roadbed, which are positioned on the same side, by utilizing skylight time; (3) laying a tunnel liner on the inner formwork; (4) adducting the inner formwork, and moving the inner formwork to the position between the next two adjacent contact net upright posts of the existing roadbed along the extension direction of the existing roadbed; (5) moving a contact net conducting wire of the existing roadbed to the top on the inner side of the tunnel liner, and dismantling the contact net upright posts of the existing roadbed; and (6) repeating the step (3) to step (5) till the completion of the laying of the whole tunnel liner above the existing roadbed. According to the method disclosed by the invention, the traffic along the railway can be improved, noise pollution can be eliminated, and the value of the area surrounding the railway can be upgraded.

Description

technical field [0001] The invention relates to the field of reconstruction of existing railway routes, in particular to a method for converting an existing roadbed into a tunnel without interrupting railway operation. Background technique [0002] As the pace of urbanization is getting faster and faster, many railway lines pass through the main urban area of ​​the city. Although these historically built railways have made indelible contributions to the prosperity of the city, with the development of the times, the railways in the main urban area, especially the railways in the form of road cuttings, divided the city into multiple plots, resulting in tension on both sides of the railway. The traffic is inconvenient, and the noise brought by the running of the train has affected the lives of residents along the railway. In addition, there is usually a lot of garbage piled up along the railway line. If the garbage is not disposed of in time, it will damage the landscape along...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E01B37/00
Inventor 焦齐柱陈立保苗德海龚彦峰孙文昊阳习丰莫阳春黄胜
Owner CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products