Method for scraping arch of ballastless track
A ballastless track and scraper technology, which is applied in track, track laying, track maintenance, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0010] The present invention will be further described below in conjunction with the accompanying drawings, but it is not intended to limit the present invention, and the scope of protection of the present invention is subject to the content recorded in the claims.
[0011] The method of this embodiment is as figure 1 It shows that the shoulder sealing layer (2) and the concrete between the lines (3) in a certain range of the upper arch section are removed, and about l5cm of graded gravel is cut from the subgrade surface (4), that is, the lower cut part (1) provides work for construction machinery. space. The excavation shall be completed with mechanical auxiliary tools, the excavation test shall be carried out before the construction, and the graded crushed stone shall be pre-loosened if necessary according to the actual situation. For pre-loosening, use a horizontal drilling machine to perform horizontal cross-drilling, and loosen the graded gravel within a depth range of 1...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


