Offshore steel cylinder construction positioning system

A positioning system and steel cylinder technology, applied in the field of GPS construction positioning system in port engineering, can solve the problems of being far away from the shore and failing to meet the requirements, and achieve improved reliability, reliable channel switching and power supply methods, and liquid level testing Effects of Accuracy Disturbance

Active Publication Date: 2013-06-05
TIANJIN PORT ENG INST LTD OF CCCC FIRST HARBOR ENG +2
View PDF3 Cites 18 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] A few years ago, our bureau carried out offshore steel cylinder construction projects in the Yangtze River Estuary, Panyu and other places, but they were all near-shore constructions, and their plane co...

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Offshore steel cylinder construction positioning system
  • Offshore steel cylinder construction positioning system
  • Offshore steel cylinder construction positioning system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0027] like figure 1 The offshore steel cylinder construction positioning system shown is a positioning monitoring system composed of GPS, automatic tracking total station, high-precision liquid level gauge, wireless data transmission station, desktop computer, etc. The system establishes the hull equipment coordinate system on the positioning ship , determine the installation parameters of GPS positioning antenna and automatic tracking total station in this coordinate system. Install four 360-degree reflective prisms at an angle of 90 degrees on the outside of the vibrating beam, and the distance from the center of each prism to the center of the steel cylinder is equal.

[0028] The GPS positioning antenna measures the WGS84 coordinates, and obtains the engineering coordinates of the GPS positioning antenna points according to the coordinate conversion parameters. Combined with the installation parameters of GPS positioning antenna, total station and other equipment, as wel...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

Provided is an offshore steel cylinder construction positioning system. The offshore steel cylinder construction positioning system is a positioning monitoring system which is composed of a global position system (GPS), an automatic tracking total station, a high-precision liquid indicator, a wireless data transfer radio, a desk computer and the like. According to the offshore steel cylinder construction positioning system, a hull equipment coordinate system is built in a positioning ship, and installation parameters of a GPS positioning antenna and the automatic tracking total station are confirmed in the hull equipment coordinate system. Four 360-degree reflecting prisms are installed on the outer side of a vibrating beam in 90-degree angle mode. Data of a reflecting mirror hull coordinate system, an included angle between a hull coordinate system and a engineering coordinate system, a reflecting mirror engineering coordinate, a plane engineering coordinate of a cylinder positioning central point, a basic standard fore shaft azimuth angle, a cylinder upper edge opening elevation and the like are calculated and are cleared up according to a plane geometrical relationship between key points of a hull and a steel cylinder, and skewing correction of coordinates of the key points in the hull coordinate system, and finally, accurate positioning is achieved. The offshore steel cylinder construction positioning system reduces complexity of a system to improve reliability under the premise that using requirements are satisfied.

Description

technical field [0001] The invention belongs to a GPS construction positioning system for port engineering, in particular to a construction positioning system for steel cylinders on the sea. Background technique [0002] Our Bureau recently undertook the construction of the artificial island of the Hong Kong-Zhuhai-Macao Bridge. In this project, about 150 steel cylinders with a diameter of 22 meters had to be vibrated in the sea. During construction, parameters such as the central coordinates, inclination angle, and elevation of the cylinder mouth of the steel cylinder must be monitored in real time. There are four longitudinal locks on the outside of the cylinder, and the spatial azimuth of the locks should also be monitored. [0003] A few years ago, our bureau carried out offshore steel cylinder construction projects in the Yangtze River Estuary, Panyu and other places, but they were all near-shore constructions, and their plane coordinates were determined by methods suc...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G01C15/00G01C9/00G01C5/00G01C1/00
Inventor 邵蔚刘馨郭科李明黄泰
Owner TIANJIN PORT ENG INST LTD OF CCCC FIRST HARBOR ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products