Lifting layered production string
A layered oil recovery, lifting technology, applied in the direction of drill pipe, casing, production fluid, etc., can solve the problems that affect the oil recovery rate, the improvement of oilfield development benefits, interlayer interference, and prominent interlayer contradictions, etc., and achieve significant technical effects and economic benefits, reduce the number of operations, and save operating costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0017] For the detailed description and technical content of the present invention, cooperate with the attached picture The description follows, however the attached picture It is provided for reference and illustration only, and is not intended to limit the present invention.
[0018] according to picture As shown in the paper, a lift-type layered oil production string is composed of a production string and a hand-off string. The production string includes a hydraulic control pipeline 1, a hydraulic lifting device 2, a production tubing 3, an oil well pump 4, a seal Plug 7 and guide wire plug 9. connected from top to bottom. The lost-hand string is composed of a hanging packer 5 , a double-layer sand filter pipe 6 , a layered packer 8 and a bottom plug 10 . The double-layer sand filter pipe 6 is set outside the sealing plug and is located in the oil layer at the lower end of the hanging packer 5, the hanging packer is set at the upper end of the sealing plug below the oil...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 