A method for estimating the duration
A long-time and long-wait technology, applied in the field of data processing, can solve the problems of resource scheduling or other task scheduling plans that are difficult to carry out smoothly, and cannot provide users with the remaining time of the distributed system in a timely manner.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0059] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0060] For example, in a distributed system, there are n tasks being executed, and n is an integer greater than 0. The sizes of these n tasks are respectively S1, S2, S3..., Sn; the processing progress of these n tasks are respectively C1, C2, C3..., Cn, where the processing progress can be the completion percentage of a task; the n The executed durations of the tasks are respectively Tr1, Tr2, Tr3..., Trn; the execution speeds of these n tasks are respectivel...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com