Interactive foundation construction site safety management system

A technology of safety management and management system, applied in the field of management system on construction site, which can solve the problems of blocked construction progress, difficulty in coordinating the time of relevant personnel, and inadequate safety and quality management.

Inactive Publication Date: 2014-01-15
HUZHOU TAILUN POWER AUTOMATION ENG
View PDF4 Cites 9 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] The power grid infrastructure project involves many construction units and supervision units, with complex personnel and difficult management
Due to the duplication of the work level of each construction unit in the project construction, it is inevitable that the safety and quality management is not in place, the progress cannot be guaranteed, repeated construction, material waste, project rework, etc.
[0003] As the hub of infrastructure management, the owner needs to solve some problems in project management with the continuous development of engineering projects: First, the various power grid infrastructure projects in the region have a large number of sites, scattered geographical distribution, and unified management is difficult
However, the owner's management personnel are limited, relying only on on-site supervision, the personnel strength is stretched and overwhelmed, and a modern management and control method is urgently needed
In addition, the traditional project site management information is limited, mainly based on written contact sheets and digital photos, lacking multimedia information content, and lacking real-time performance; the information communication method between the site and the superior competent department is single and old-fashioned, and many issues that need to be coordinated on site It is mainly based on telephone contact, which requires more intuitive and effective command means
Finally, on-site construction problems often require technical support from the manufacturer, or multi-departmental coordination to solve them. It is difficult to coordinate the time of relevant personnel when all parties are called for a meeting, and the construction progress may be hindered

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Interactive foundation construction site safety management system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0019] The present invention provides an interactive infrastructure site safety management system, which includes a management system platform and front-end monitoring equipment. The front-end monitoring equipment collects, encodes, stores and uploads on-site video. The management system platform includes Hikvision iVMS platform, server And the monitor, the Hikvision iVMS platform is connected to the network of the front-end monitoring equipment and receives the uploaded data from the front-end monitoring equipment, the server is connected to the Hikvision iVMS platform for data storage, and the monitor is connected to the Hikvision iVMS platform to display the surveillance video.

[0020] Use the front-end monitoring equipment to obtain the video information of the infrastructure site, carry it through the power optical fiber or the operator's wireless network, and realize the all-round management of the front-end infrastructure site through the management system platform in th...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses an interactive foundation construction site safety management system and relates to construction management systems. The interactive foundation construction site safety management system solves the technical problem that in existing engineering construction, working levels of all construction units are repeated and consequently management is not in place. The interactive foundation construction site safety management system comprises a management system platform and a front-end monitoring device. The front-end monitoring device collects, codes, stores and uploads a site video. The management system platform comprises a Hikvision iVMS platform, a server and a display. The Hikvision iVMS platform is connected with the front-end monitoring device through a network and receives uploaded data of the front-end monitoring device. A server is connected with the Hikvision iVMS platform and used for storing data, and the display is connected with the Hikvision iVMS platform and used for displaying a surveillance video. The management system platform shares the video, achieves communication and interaction of all departments, coordinates progress schedules in different places, and solves the problems that a grid foundation construction engineering site is wide in range, large in quantity, disperse in geographical distribution and difficult in unified management.

Description

【Technical field】 [0001] The invention relates to a management system, in particular to a construction site management system. 【Background technique】 [0002] The power grid infrastructure project involves many construction units and supervision units, with complex personnel and difficult management. Due to the duplication of the work level of each construction unit in the project construction, it is inevitable that the safety and quality management is not in place, the progress cannot be guaranteed, repeated construction, material waste, and project rework. [0003] As the hub of infrastructure management, the owner needs to solve some problems in project management with the continuous development of engineering projects: First, various power grid infrastructure projects in the region have a large number of sites, scattered geographical distribution, and unified management is difficult. However, the owner's management personnel are limited, and only relying on on-site supe...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): H04N7/18
Inventor 黄乐强
Owner HUZHOU TAILUN POWER AUTOMATION ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products