An amphibian aquatic animal and construction method technology, which is applied to the construction of rare cold water fish and amphibian aquatic animal breeding water regulation pools, can solve the problems of particularly high breeding and growing environmental conditions, high breeding costs, etc., and achieves improved survival rate, operation Simple, disease-reducing effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] see figure 1 , a kind of rare cold water fish and amphibian aquatic animal breeding water regulation pool construction method, including the construction of the water inlet pipe 10, the pool, the filter tank 2, the water outlet pipe 9, and it is characterized in that the construction method steps are as follows:
[0028] Step 1: Construction of Underground Tunnel Pool 1
[0029] Dig 5m down the ground to build an underground tunnel pool 1 with a length of 5m x height of 0.5m x width of 0.5m;
[0030] The lower part of the other end of the underground tunnel pool 1 is connected to the filter layer support 22 of the filter pool;
[0031] On the upper part of the other end of the underground tunnel-type pool 1, an underground tunnel-type pool access hole 5 and an underground tunnel-type pool access hole sealing cover plate I7 are built;
[0032] The top surface of the underground tunnel pool 1 is then covered with a 5m thermal insulation soil layer 3 .
[0033] Step 2...
Embodiment example 2
[0046] see figure 1 , a kind of rare cold water fish and amphibian aquatic animal breeding water regulation pool construction method, including the construction of the water inlet pipe 10, the pool, the filter tank 2, the water outlet pipe 9, and it is characterized in that the construction method steps are as follows:
[0047] Step 1: Construction of Underground Tunnel Pool 1
[0048] Dig 10m down the ground to build an underground tunnel pool 1 with a length of 10m x height of 1m x width of 1m;
[0049] The lower part of the other end of the underground tunnel pool 1 is connected to the filter layer support 22 of the filter pool;
[0050] On the upper part of the other end of the underground tunnel-type pool 1, an underground tunnel-type pool access hole 5 and an underground tunnel-type pool access hole sealing cover plate I7 are built;
[0051] The top of the underground tunnel pool 1 is then covered with a 10m thermal insulation soil layer 3 .
[0052] Step 2: Constru...