Air duct for accurately supplying air to front side of server
A precise air supply and server technology, applied in the direction of instruments, electrical digital data processing, digital data processing components, etc., can solve the problems of direct and accurate air supply difficulties, waste of cold air, return of hot air, etc., to avoid the return of hot air , avoid the effect of cold air waste
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment approach 1
[0014] Specific implementation mode one: see figure 1 and 2 Describe this embodiment, an air duct for accurately supplying air to the front of server equipment described in this embodiment, it includes a horizontal air guide sub-box 1 and a front air outlet cover 2, and the horizontal air guide sub-box 1 is horizontal It is a triangular prism with a hollow cavity inside, and any two of the three sides of the horizontal air guide sub-box 1 are provided with through holes 1-1, and the two sides are respectively defined as the front side and right sides,
[0015] The front air outlet cover 2 is a cover body composed of an arc-shaped transparent baffle and two transparent side panels,
[0016] The length of the front air outlet cover 2 is the same as the length of the right side of the horizontal air guide sub-box 1, and the front air outlet cover 2 is fixedly connected with the right side of the horizontal air guide sub-box 1, and the front air outlet cover The upper end surfa...
specific Embodiment approach 2
[0019] Specific implementation mode two: see figure 1 and 2 This embodiment is described. The difference between this embodiment and the air duct for accurately supplying air to the front of the server equipment described in the first embodiment is that it also includes two fixed hanging ears 3, and the two fixed hanging ears 3 They are respectively arranged on both sides of the front air outlet cover 2, and are respectively fixedly connected to the front side and the rear side of the horizontal air guide sub-box 1.
[0020] The two fixed lugs 3 in this embodiment are used for fixed connection with a 19-inch rack.
[0021] In this embodiment, the horizontal wind guide box 1 can use a sheet metal production process, and two punched metal sheets are bent and then assembled together. The fixed hanger 3 can also be formed after bending 90 degrees with a stamped sheet metal. The front air outlet cover 2 is made of transparent plastic material such as PE, PP or acrylic, which can...
specific Embodiment approach 3
[0022] Specific embodiment 3: The difference between this embodiment and the air duct for accurately supplying air to the front of the server equipment described in specific embodiments 1 or 2 is that the height of the front air outlet cover 2 is 1U, 2U, 4U or 5U.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 