Check patentability & draft patents in minutes with Patsnap Eureka AI!

Mine resource reserve verification and cancellation method based on blasting elements

A technology of blasting unit bodies and mines, which is applied in the field of underground mining technology and computer three-dimensional modeling, can solve problems such as inability to refine, insufficient process control of mineral resources, and unsystematic management, so as to improve precision and realize refined management. Effect

Inactive Publication Date: 2014-10-15
NANJING MEISHAN METALLURGY DEV +1
View PDF3 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] There are big defects in the traditional management of mineral resources in mines. The main manifestations are: the main maps and documents require manual drawing and sorting, and traditional methods are used to estimate resources / reserves, which is outdated and inefficient; the utilization of mineral resources in the production process It is limited to the entire layer or ore block, and cannot be refined to each mining blasting unit. The process control of mineral resources is not enough, and the management is not fine enough; the various basic data of resources / reserves are scattered, the management is not systematic, and it is impossible to realize the mining. Tracking and system management of resources from ascertained geological reserves, designed recoverable reserves, recycled reserves and lost reserves

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Mine resource reserve verification and cancellation method based on blasting elements
  • Mine resource reserve verification and cancellation method based on blasting elements
  • Mine resource reserve verification and cancellation method based on blasting elements

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0023] The technical solutions provided by the present invention will be described in detail below in conjunction with specific examples. It should be understood that the following specific embodiments are only used to illustrate the present invention and are not intended to limit the scope of the present invention.

[0024] A method for checking and writing off mine resource reserves based on blasting units, comprising the following steps:

[0025] (1) On-site data processing

[0026] Correspond each blasting unit on the site to a row of ranks. Although each row has a unique row number, when counting the actual production site, it is often only the number of rows blasted in a certain production area, which needs to be processed in subsequent data processing. Each row of corresponds to the corresponding row number. In the actual production management, the on-site management method of regular census is adopted, and the number of the current blasting row is determined according...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a mine resource reserve verification and cancellation method based on blasting elements. The mine resource reserve verification and cancellation method mainly comprises the following steps: managing on-site production data by a database; carrying out standardization management to the blasting elements, and invoking the blasting elements according to the production data; and forming a resource / reserve verification-and-cancellation and statistical analysis report by three-dimensional software. An ore body and the blasting elements are modeled, so that the practical spatial position and the real spatial form of each blasting element can be visually displayed in a computer, the geologic attribute of each blasting element can be obtained in a resource model of a mineral deposit, the practical available geological reserve, the design backstopping reserve and the mining practically-consumed geological reserve of the mineral deposit can be visually and scientifically estimated and subjected to statistical analysis, reserve verification and cancellation precision and efficiency for carrying out the statistical analysis are greatly improved, and the fine management of resources is realized.

Description

technical field [0001] The invention relates to the fields of underground mining technology and computer three-dimensional modeling, in particular to a method for writing off mine resource reserves based on blasting units. Background technique [0002] Mineral resources are the basis for the existence of mining enterprises, and mineral resource management is an important task for mining enterprises. The main content includes: ascertaining the resources / reserves of mines, providing detailed geological data, and providing a basis for mining design and production; supervising and statistically analyzing the utilization of mineral resources in the process of mining production, and making full use of mineral resources. [0003] There are big defects in the traditional management of mineral resources in mines. The main manifestations are: the main maps and documents require manual drawing and sorting, and traditional methods are used to estimate resources / reserves, which is outdat...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/02
Inventor 陈小文宋革文吴荣高许元清
Owner NANJING MEISHAN METALLURGY DEV
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More