Active support method used for tunnel crossing existing bridge

A technology for bridges and tunnels, which is applied in the field of active support for tunnels crossing existing bridges, and can solve problems such as imperfect monitoring systems and bridge deformation

Inactive Publication Date: 2015-07-08
北京市重大项目建设指挥部办公室 +3
View PDF3 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] Therefore, the technical problem to be solved by the present invention is to overcome the problem in the prior art that the bridge may be deformed due to failure to judge whether the bridge needs active jacking before construction, thereby providing a method for judging whether the bridge needs to be jacked before construction to ensure that the bridge Non-deformable active support method for tunnel crossing existing bridges
[0005] The technical problem to be solved by the present invention is to overcome the imperfection of the active support monitoring system in the prior art so as to provide an active support method for tunnels crossing existing bridges with a perfect monitoring system

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Active support method used for tunnel crossing existing bridge
  • Active support method used for tunnel crossing existing bridge

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0033] This embodiment provides an active support method for tunnels crossing existing bridges, including

[0034] Step S1: Before the tunnel crossing construction, use a jacking system with several arranged jacking devices to actively lift the bridge, and the active jacking amount is determined according to the bridge settlement that will be caused by the tunnel crossing construction;

[0035] Step S2: Monitor the jacking amount of the bridge that has passed step S1 to determine whether the active jacking amount requirement is met, if not, repeat step S1, and if it is satisfied, first use the support to raise the bridge, Afterwards, the beams will be dropped to prepare for the tunnel crossing construction.

[0036] The above method is the core technical solution of the active support method for tunnel crossing existing bridges in the present invention. Before the tunnel crossing construction, the active jacking is performed according to the bridge settlement that may be cause...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides an active support method used for a tunnel crossing an existing bridge. The method comprises the steps: S1, before tunnel crossing construction, a jacking system with a plurality of arranged jacking apparatuses is adopted for actively jacking the bridge; S2, the jacking amount of the bridge subjected to the step S1 is monitored to judge whether the jacking amount meets an active jacking amount requirement; if not, the step S1 is repeated; if so, the bridge is firstly raised by adopting supporting seats, and then girder falling is carried out so as to prepare for the tunnel crossing construction. According to the invention, before the tunnel crossing construction, active jacking is carried out according to the bridge setting amount which is possibly caused by the tunnel crossing construction, even if the bridge subsides after the construction, the bridge can be still maintained within a safe range, and the hazards of stress, cracks, sedimentation and the like of the bridge caused by the tunnel crossing construction are avoided; and the potential safety hazard problem of the bridge caused by the construction can be solved by the active jacking.

Description

technical field [0001] The invention relates to an active support method for a tunnel crossing an existing bridge, which belongs to the technical field of construction. Background technique [0002] With the continuous development of urban rail transit, the spatial intersection between urban tunnels and the foundations of existing bridges is inevitable. Disturbances in the upper and surrounding strata directly lead to damages such as deformation, displacement, and internal stress increase of the bridge foundation and superstructure to varying degrees. When this impact exceeds the allowable safety control range of the existing bridge, it will lead to new structural damage of the bridge or aggravate the damage of the existing damage, which seriously threatens the use safety or structural safety of the bridge. In addition, once the above-mentioned problems occur, it will inevitably cause delays in the tunnel crossing construction, which in turn will generate a series of additi...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E01D22/00
CPCE01D22/00
Inventor 杨广武周正宇徐会杰王佳妮徐贺文师小瑜苏洁杨三资
Owner 北京市重大项目建设指挥部办公室
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products