Prospective target framework design method based on saturation load
A technology of target grid and design method, applied in the field of long-term target grid design based on saturated load, can solve the problems of high cost, low efficiency, unreasonable substation location and capacity design, etc., to achieve cost reduction, power supply optimization, The effect of improving the reliability of power supply
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] Below in conjunction with accompanying drawing, the present invention is described in further detail:
[0020] refer to figure 1 and figure 2 , the design method of the long-term target grid frame based on the saturated load of the present invention comprises the following steps:
[0021] 1) Divide the area to be designed into several load areas, obtain the geographic location information of each load area, and predict the load of each load area;
[0022] 2) Preset the number of established substations, and then take the capacity and location of each substation as independent variables to construct a target model with the minimum cost sum f, wherein the target model with the minimum cost sum f is:
[0023] min f=f 1 +f 2 +f 3
[0024] in, c is the cost of the new substation, k is the capital recovery rate, m is the capital recovery period, f 2 is the running variable cost fee, f 2 =(1+a)f 1 , a is constant, a is 15%, l j is the total length of the line fr...