One-time pouring and molding construction technology of fully enclosed columns in subway stations with cover-excavation
A technology for subway stations, cover-digging inverse work, applied in construction, artificial islands, water conservancy projects, etc., can solve the problems of reducing the adverse effects of closed columns on the support strength, structural rigidity, durability, waterproofing of the upper plate, etc. Concrete waste, short construction period, lightweight formwork structure
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0033] The present invention relates to a construction process of one-time pouring and forming of fully enclosed columns of subway stations with cover-excavation, including the following steps:
[0034] 1. Excavate and pour the upper slab 6 and the lower slab 8 of each floor subway station sequentially from top to bottom, and set temporary column support between the upper slab 6 and the lower slab 8. Such as Figure 1-Figure 2 As shown, when pouring, a plurality of anchor bars 7 arranged vertically at the position corresponding to the closed column 1 in the upper plate 6 and the lower plate 8 are respectively pre-embedded with a plurality of steel bar sleeves 4, and the steel bar sleeves 4 are formed by the upper plate 6 and the lower plate 8 respectively. The opposite surface of the plate 8 is drawn; and if the subway station on this floor is the lowest floor, two exhaust iron pipes 5 are respectively pre-buried in the lower part of the upper plate 6 corresponding to the clos...