Unlock instant, AI-driven research and patent intelligence for your innovation.

One-time pouring and molding construction technology of fully enclosed columns in subway stations with cover-excavation

A technology for subway stations, cover-digging inverse work, applied in construction, artificial islands, water conservancy projects, etc., can solve the problems of reducing the adverse effects of closed columns on the support strength, structural rigidity, durability, waterproofing of the upper plate, etc. Concrete waste, short construction period, lightweight formwork structure

Inactive Publication Date: 2016-06-08
CREC SHANGHAI CIVIL ENG BUREAU GRP NORTHERN ENG +1
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

There are certain defects in the existing cover-excavation construction: 1. The uneven settlement of the closed column during the construction process has a serious adverse effect on the closed column structure system, especially the air hole gap between the top of the closed column and the upper plate is easy to occur, thereby reducing the sealing effect. The support strength of the column to the upper plate; 2. Due to the impact of shrinkage and sinking of the concrete structure of the closed column during the hardening process, cracks inevitably appear, which have an adverse effect on the rigidity, durability, and water resistance of the structure

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • One-time pouring and molding construction technology of fully enclosed columns in subway stations with cover-excavation
  • One-time pouring and molding construction technology of fully enclosed columns in subway stations with cover-excavation
  • One-time pouring and molding construction technology of fully enclosed columns in subway stations with cover-excavation

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0033] The present invention relates to a construction process of one-time pouring and forming of fully enclosed columns of subway stations with cover-excavation, including the following steps:

[0034] 1. Excavate and pour the upper slab 6 and the lower slab 8 of each floor subway station sequentially from top to bottom, and set temporary column support between the upper slab 6 and the lower slab 8. Such as Figure 1-Figure 2 As shown, when pouring, a plurality of anchor bars 7 arranged vertically at the position corresponding to the closed column 1 in the upper plate 6 and the lower plate 8 are respectively pre-embedded with a plurality of steel bar sleeves 4, and the steel bar sleeves 4 are formed by the upper plate 6 and the lower plate 8 respectively. The opposite surface of the plate 8 is drawn; and if the subway station on this floor is the lowest floor, two exhaust iron pipes 5 are respectively pre-buried in the lower part of the upper plate 6 corresponding to the clos...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a one-time pouring and forming construction technology for totally enclosed columns of a cover and excavation top-down subway station. The one-time pouring and forming construction technology comprises the following steps that firstly, excavation is performed sequentially from top to bottom, and each layer of upper plates and each layer of lower plates are poured; during pouring, a plurality of rebar casing pipes are pre-buried inside the upper plates and the lower plates; exhaust iron pipes are pre-buried in the lower portions of the interiors of the upper plates; secondly, survey setting out is performed on the closed columns; thirdly, whether the positions of the rebar casing pipes exceed the dimension range of the closed columns or not is inspected; fourthly, rebars are bound on the closed columns; fifthly, closed column formworks are manufactured and erected; sixthly, pouring is performed through all pouring mouths sequentially from bottom to top, vibration is performed during pouring through vibration mouths in the pouring process; seventhly, after concrete reaches the requested strength, the formworks can just be dismantled. The one-time pouring and forming construction technology has the advantages that tight combination between the tops of the closed columns and the upper plates can be guaranteed, and therefore the supporting strength of connection between the closed columns and the upper plate is ensured. Moreover, the construction cycle is short, the closed columns can be poured and formed at a time, it can be guaranteed that the centers and the surfaces of the closed columns are vibrated to be compacted, and no concrete defects are produced.

Description

technical field [0001] The invention relates to a construction technology, in particular to a construction technology of one-time pouring and forming of a fully enclosed column of a subway station by cover-excavation. Background technique [0002] Cover-excavation is a new type of engineering construction method that needs to cross roads, buildings and other obstacles when the underground engineering is done openly. After the ground is excavated to a certain depth, the top is closed, and the rest of the substructure is in the closed area. Construction under the roof. When subway stations are built in busy urban areas, roads are often occupied and traffic is affected. This method can be used when subway stations are located on main roads and traffic cannot be interrupted, and certain traffic flow requirements must be ensured. There are certain defects in the existing cover-excavation construction: 1. The uneven settlement of the closed column during the construction process ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D29/045
Inventor 杨兴岩梁金桥李昊严志
Owner CREC SHANGHAI CIVIL ENG BUREAU GRP NORTHERN ENG