Closing method of pile leg and spud can of drilling platform
A technology for drilling platform pile legs and spud boots, which is applied in water conservancy projects, artificial islands, underwater structures, etc., can solve the problems of long cycle time and inconvenient inspection of pile leg welding conditions, and achieve the effect of improving work efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0030] Please combine Figure 1-2 It should be understood that a method for closing a drilling platform leg and a spud can comprises the following steps:
[0031] S0: fix the bracket 10 to the spud shoe;
[0032] S1: Divide a cutting area on the side of the bracket 10 close to the leg. Select the side of the bracket 10 close to the leg for the cutting area;
[0033] S2: Cut the cutting area to obtain a first bracket segment 11 for connecting with the pile leg, the remaining part after cutting the bracket 10 is the second segment 12 of the bracket, the first segment 11 of the bracket is connected with the bracket leg The second plate segment 12 can be assembled into a complete bracket 10;
[0034] S3: welding the first segment 11 of the bracket to the bottom of the leg;
[0035] S4: fixing the bottoms of the legs together through several horizontal support pipes;
[0036] S5: Fix the bottoms of the legs together through a number of inclined support pipes to obtain a whole ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

