A construction method to ensure the pouring of toilet water-stop sills
A construction method and technology of water-stop sill, which is applied to the processing of building materials, construction, and building components, etc., can solve the problems of non-standard construction technology, easy leakage, and uneven quality of water-stop sills, and achieve fast and convenient construction , low cost, and the effect of ensuring the molding quality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0012] The present invention will be further described below in conjunction with the accompanying drawings.
[0013] The construction method to ensure the pouring and forming of the toilet water-stop sill includes the following steps:
[0014] (1) Positioning: On the ground 1, carry out the beam-slab structural reinforcement binding and formwork support, and position the toilet water-stop sill;
[0015] (2) Concrete 3 is poured first: hang the formwork on the water-stop sill, disconnect 100-300mm from the junction with the concrete wall 2, install steel bars and control the elevation, seal the formwork port tightly, pour concrete and maintain it;
[0016] (3) Section waterproof treatment: After the concrete poured in step (2) is cured for 7 days and the formwork is removed, the surface of the broken section opposite to the concrete wall is treated, the surface dust and floating slurry are removed, and the slurry is painted and the concrete interface is treated. agent or cemen...