Equivalent coordinative optimization method for large-scale power grid dispatching plan

A technology of power grid scheduling and optimization methods, applied in the direction of single-network parallel feeding arrangement, etc., can solve problems that cannot be solved by modeling methods, complex constraints, and many influencing factors

Active Publication Date: 2016-01-06
CHINA ELECTRIC POWER RES INST +2
View PDF2 Cites 23 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] The optimization problem of large-scale power grid dispatching plan is a mathematical programming problem with super large-scale, multi-objective, complex constraints and many influencing factors, which cannot be solved by conventio

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Equivalent coordinative optimization method for large-scale power grid dispatching plan
  • Equivalent coordinative optimization method for large-scale power grid dispatching plan
  • Equivalent coordinative optimization method for large-scale power grid dispatching plan

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0047] The specific embodiments of the present invention will be further described in detail below in conjunction with the accompanying drawings.

[0048] Refer to attached figure 1 , the equivalent optimization method of large-scale power grid dispatching plan is:

[0049]Step 1. Divide the large power grid into several regional power grids. Each regional power grid is connected to other regional power grids through tie lines, so each regional power grid can be equivalent to the regional power grid at the point where each tie line is associated , so that the equivalent value of each regional grid is a small network composed of equivalent nodes, and each equivalent node is connected to an equivalent generator with a certain load, and the internal physical laws of the regional grid can be passed through Each equivalence node is reflected. After the equivalence, the regional power grids are transformed into equivalent nodes at the drop points of the tie lines, and each equival...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides an equivalent coordinative optimization method for a large-scale power grid dispatching plan. The optimization method comprises the steps as follows: (1) a large power grid is divided into a plurality of regional power grids, and the regional power grids are taken as equivalent nodes; (2) the regional power grids submit information of the equivalent nodes to the whole grid; (3) the whole grid determines a generation dispatching plan under the equivalent regional power grids, and issues a connecting line plan between the regions, planned total output of the regional power grids and a plan of a direct dispatching set; (4) the regional power grids calculate and determine output plans of regional sets according to the planned total output of the regional power grids, and calculate locational marginal cost; and (5) whether full-grid optimization is converged or not is judged through the marginal cost of two ends of a connection line, if so, calculation is ended, if not, the set which affects the grid security constraint corrects output bounds according to the optimization result and turns to the step (2). The iteration times can be controlled; the convergence is rapid; and rapid determination of the large power grid dispatching plan can be achieved.

Description

technical field [0001] The invention belongs to the technical field of electric power system scheduling automation, and in particular relates to an equivalent coordination and optimization method for a large-scale power grid scheduling plan. Background technique [0002] The optimization problem of large-scale power grid dispatching plan is a mathematical programming problem with super-large-scale, multi-objective, complex constraints, and many influencing factors. Conventional modeling methods for this type of system have been unable to solve it. To achieve multi-area joint optimization or overall optimization, the current methods are mainly the application of large-scale system theory, simplified equivalents and other methods. [0003] The existing large-scale power grid equivalent method usually simply converts it into an equivalent unit, but the information extraction of unit parameters is not accurate enough, the equivalent grid information cannot be accurately expresse...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): H02J3/38
Inventor 朱泽磊戴赛崔晖胡晨旭刘芳
Owner CHINA ELECTRIC POWER RES INST
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products