Hanging mounting method of long heavy stay cable under space limited condition
An installation method and cable-stayed technology, applied in the direction of erecting/assembling bridges, bridge parts, bridge construction, etc., can solve problems such as difficulties, broken and damaged steel strands, unsafety, etc., and achieve the effect of reducing construction costs and reducing waste
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0045] refer to Figure 1 to Figure 9 , which shows the specific structure of the preferred embodiment of the present invention. The structural features of each element of the present invention will be described in detail below, and if there is a description to the direction (up, down, left, right, front and back), it is based on Figure 9 The shown structure is a reference description, but the actual use direction of the present invention is not limited thereto.
[0046] The present invention provides a long and heavy stay cable hanging installation method under the condition of limited space, including the first stay cable 3 on the middle span side of the cable tower 2 and the second stay cable on the side span side of the cable tower 2 The installation of rope 14 comprises the following steps:
[0047] S05. The first stay cable 3 is stretched: arrange the cable reel 1 under the cable tower 2, hang the coiled first stay cable 3 on the cable reel 1, and ensure the first sta...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com