Electricity charge calculating system and method based on multiple settlement main bodies
A computing system and power calculation technology, applied in computing, instruments, business, etc., can solve the problem that multiple settlement entities cannot quickly and accurately calculate the settlement power
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment 1
[0062] Specific embodiment 1, the calculation method of different electricity prices for multiple settlement entities:
[0063] Main metering point: 116 switch on the substation side of Guping Second Line of 110KV Guyuan Station;
[0064] Auxiliary metering points: switch 101 on the high voltage side of main transformer #1 in Yanshan Guyuan, switch 102 on the high voltage side of main transformer #2 in Wuhuaping Wind Farm;
[0065] Settlement formula: Total electricity on-grid of Yanshan Guyuan wind farm = Yanshan Guyuan 101 switch / (Yanshan Guyuan 101 switch + Wuhuaping 102 switch)*110KV Guyuan station Guping 2nd line substation side 116 switch
[0066] The total on-grid electricity of Wuhuaping Wind Farm = 116 KV switch on the side of Guping Second Line Substation of 110KV Guyuan Station - the total on-grid electricity of Yanshan Guyuan Wind Farm.
specific Embodiment 2
[0067] Specific embodiment 2, the calculation formula for multiple settlement entities to settle the electricity price in installments:
[0068] Main metering point: 2211 switch on the wind farm side of Yuanjia Line at Yiyuan Station of 220kv;
[0069] Auxiliary metering point: 2211 switch of 220kv Yongjia Line
[0070] Beishiyuan: switches of Yongfa 311 and 313; Kangyuan: switches of Yongfa 315 and 317.
[0071] Settlement formula: Yongfa Field and Jiaxin Field online power = Yuanjia Line 2211 switch forward active power
[0072] On-line power of Yongfa Field=Forward active power of 2211 switch of Yuanjia line*[Forward active power of 2211 switch of Yongjia line / (Forward active power of 2201 switch on high voltage side of Jiaxin No. 1 main transformer + 2201 switch on high voltage side of Jiaxin No. 2 main transformer Forward active power + Yongjia line 2211 switch forward active power)];
[0073] Beishiyan’s online electricity quantity = Yongfa field’s online electricity ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com