An installation method and technology of stay cables, which are used in bridge construction, bridges, erection/assembly of bridges, etc., can solve the problem that the horizontal hoisting distance of stay cables is too large, the stay cables cannot be satisfied, and the tower ends of stay cables cannot be completed. Lifting work, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0020] The present invention will be further described below in conjunction with the accompanying drawings.
[0021] Such as figure 1 As shown, the equipment used in the method of the present invention includes a tower top bracket 7, a first traction hoist 1, a second traction hoist 12, a main traction wire rope 6, a first puller 5, a second puller 8, a first Traction wire rope 3, the first steering block 2, the first pulley group 4, the second traction wire rope 10, the second steering block 11 and the second block block 9.
[0022] Before the stay cable enters the hoisting operation stage, the tower top bracket 7 is installed on the top of the main tower 13, the first traction hoist 1 and the second traction hoist 12 are installed on the beam surface of the main beam 16, and the two traction hoists are respectively installed on the main tower. 13 sides. The main traction wire rope 6 passes through the tower top bracket 7, and the first pulley group 4 and the second pulley ...