A multi-node disaster recovery method and NGCC nodes
A multi-node disaster recovery and node technology, applied in the direction of digital transmission system, electrical components, transmission system, etc., can solve the problem of the decrease of the connection rate of manual traffic, so as to solve the decrease of the connection rate of manual traffic and realize unified scheduling Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0062] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention more clear, specific embodiments will be described in detail below with reference to the accompanying drawings.
[0063] The present invention aims at the problem that the manual call completion rate and the agent resources are reduced caused by the multi-node disaster recovery processing method in the prior art. The embodiment of the present invention makes appropriate adjustments to the existing multi-node disaster recovery processing method Improvement, for specific structural improvements, see figure 2 As shown, for this purpose, the embodiment of the present invention provides a multi-node disaster recovery method, such as image 3 As shown, it is applied to an IP network including a plurality of NGCC nodes, one of the plurality of NGCC nodes is provided with a main C3F routing logic module, and the remaining NGCC nodes are provided with a backup C3F routin...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 