A kind of extraction tower and the method for solvent deasphalting
A technology of extraction tower and tower body, which is applied in the field of extraction tower and solvent deasphalting, which can solve the problems of solvent deasphalting and extraction, and achieve the effect of improving extraction efficiency, improving mass transfer efficiency, and avoiding clogging deposition
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0056] This example is used to illustrate the solvent deasphalting method provided by the present invention.
[0057] Such as figure 1 The extraction tower shown has a tower diameter of 300mm and a tower height of 2m. The height of the packing area is 800mm, the diameter of the support column 6 is 210mm, the diameter of the central cylinder 7 is 30mm, and the diameter of the isolation cylinder 4 is 120mm. The angles between the first annular baffle 18 and the second annular baffle 14 and the horizontal plane are both 45°. The distance between adjacent first annular baffles 18 and between adjacent second annular baffles 14 in the direction of the central axis of the tower body 2 is 25 mm. The size of the opening is 5mm, and the opening ratio is 50%. There are three vertical partitions 31 . There are three first heavy component fluid collection pipelines 10, and three second heavy component fluid collection pipelines 9.
[0058] The feed rate of the residual oil is 2kg / h, a...
Embodiment 2
[0061] This example is used to illustrate the solvent deasphalting method provided by the present invention.
[0062] Such as figure 2 The extraction tower shown has a tower diameter of 300mm and a tower height of 2m. The height of the packing area is 1000mm, the diameter of the support column 6 is 240mm, the diameter of the central cylinder 7 is 60mm, and the diameter of the isolation cylinder 4 is 170mm. The included angles between the first annular baffle 14 and the second annular baffle 18 and the horizontal plane are both 55°. The distance between adjacent first annular baffles 18 and between adjacent second annular baffles 14 in the direction of the central axis of the tower body 2 is 30 mm. The size of the opening is 5mm, and the opening ratio is 30%. There are four vertical partitions 31 . There are four first heavy component fluid collection pipelines 10 and four second heavy component fluid collection pipelines 9 .
[0063] The feed rate of the residual oil is ...
PUM
| Property | Measurement | Unit |
|---|---|---|
| diameter | aaaaa | aaaaa |
| height | aaaaa | aaaaa |
| diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 


