Bridge crane error tracker with initial load swing angle and trolley displacement and method
A technology of bridge crane and initial load, which is applied in the direction of load hanging components, transportation and packaging, etc., and can solve problems such as difficult engineering application, initial swing angle of load is not 0, initial displacement of trolley, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0059] Below in conjunction with accompanying drawing and embodiment the present invention will be further described:
[0060] People have intuitive and clear requirements for the expected attenuation characteristics of the error trajectory, and it is easy to give the expected error trajectory. Once the expected error trajectory is set, it can be used for the system to perform different output tasks, and its set attenuation characteristics do not need to be modified. Therefore, the present invention firstly defines the expected error trajectory of the trolley and the load swing, and on this basis, establishes the error tracking dynamic model of the bridge crane system. Then the desired target system with a specific structure is constructed, and an error tracking control method that can transform the overhead crane system into a target system is proposed. For the stability and convergence of the closed-loop system, a strict theoretical analysis is carried out in this paper thr...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com