Mining landslide prevention treatment method
A processing method and mining technology, applied in excavation, construction, infrastructure engineering, etc., can solve problems such as huge investment, and achieve the effects of improving safety factor, reducing later maintenance costs, and good economic benefits
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0018] A method for preventing and treating landslides in mines, said method comprising the following steps:
[0019] (1) Fixed isolation: Fix corrugated partitions or earth walls at the same contour line on the slope of the mine. The walls are fixedly connected by anchor rods, and the distance between adjacent anchor rods is 2 meters, the angle between the partition or earth wall and the mine slope is 60 degrees, and the partition or earth wall on the lower contour line is smaller than the adjacent one. The height of the partition or earth wall on the higher contour line is 5cm, and the depth of the partition or earth wall is 50cm;
[0020] (2) Opening water channels: Excavate earth pits every 3 meters at the bottom of the partition or earth wall, and excavate linear earth trenches between adjacent earth pits to connect with each other. The inner wall of the earth trench is 110 meters away from the mine slope degree angle, and the bottom surface of the soil ditch is in a con...
Embodiment 2
[0027] A method for preventing and treating landslides in mines, said method comprising the following steps:
[0028] (1) Fixed isolation: Fix corrugated partitions or earth walls at the same contour line on the slope of the mine. The distance between partitions or earth walls on different contour lines is controlled at 2 meters, and The walls are fixedly connected by anchors, and the distance between adjacent anchors is 3 meters, and the angle between the partition or earth wall and the slope of the mine is 75 degrees, and the partition or earth wall on the lower contour line is smaller than the adjacent one. The height of the partition or earth wall on the higher contour line is 10cm, and the depth of the partition or earth wall is 70cm;
[0029] (2) Opening water channels: Excavate earth pits every 5 meters at the bottom of the partition or earth wall, and excavate linear earth ditches between adjacent earth pits to connect with each other. The inner wall of the earth ditch...