Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Hanger used for hoisting large-section steel truss girders and hoisting method

A hoisting method and steel truss girder technology, applied in the directions of transportation and packaging, load hoisting components, etc., can solve the problems of poor economy, high economic cost, large scale of cross-sea bridges, etc., to increase the effective hoisting weight, operate Strong and versatile effect

Active Publication Date: 2016-08-31
CHINA RAILWAY MAJOR BRIDGE ENG GRP CO LTD +1
View PDF8 Cites 10 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The sea-crossing bridge is large in scale and long in length. The whole-hole or large-segment steel truss girders erected by floating cranes have different lifting point spacings, and the traditional spreaders are basically fixed lifting point spreaders, which cannot adapt to different lifting points. The lifting unit with the same spacing, or a lifting point spacing to manufacture a set of spreaders, so economically poor
The traditional connection method between the spreader and the lifting lug of the steel truss girder is the pin connection, but for the whole hole or large section steel truss girder with heavy weight (greater than 1000t), the diameter of the pin shaft is large and the weight is heavy (greater than 200kg), which cannot be relied on. Manual handling and plugging, coupled with the influence of sea wind and waves, both the spreader and the steel truss girder are in a swinging state, and the diameter of the pin shaft is basically the same as the diameter of the pin hole of the steel truss girder lifting lug. It takes a long time. If the spreader is connected to the steel truss girder in the factory, and then the steel wire rope of the spreader is directly hung on the main hook of the floating crane after being transported to the bridge position, although the on-site operation is simple and fast, each steel truss girder segment needs Equipped with a set of spreader, the economic cost is high

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Hanger used for hoisting large-section steel truss girders and hoisting method
  • Hanger used for hoisting large-section steel truss girders and hoisting method
  • Hanger used for hoisting large-section steel truss girders and hoisting method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0040] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0041] see figure 1 , figure 2As shown, the embodiment of the present invention provides a hoisting device for hoisting large-section steel truss girders. 3. The flexible connector 4, the second connecting component 5, and the second loop 6; the first connecting component 3 is connected to the lifting lug 1 of the steel truss beam through the first loop 2, and the first connecting component 3 is connected through the flexible connecting component 4 It is connected with the second connection component 5, and the second connection component 5 is connected with the hook 7 of the floating crane through the second rope loop 6.

[0042] The steel truss beam hoisted by the present invention has four lifting lugs 1, see image 3 , Figure 4 As shown, the lifting lug 1 includes a tie plate 11, which is welded to the top surface of the ste...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a hanger used for hoisting large-section steel truss girders and a hoisting method, and relates to the hoisting field of steel truss girders. The hanger is integrally symmetric along a longitudinal center line, comprises a first connecting assembly and a second connecting assembly which are connected with each other, wherein the first connecting assembly is used for connecting lifting lugs of the steel truss girder, and the second connecting assembly is used for connecting a lifting hook of a floating crane; the first connecting assembly comprises four first steel structural components, two limiting rods, two supporting rods and four moving parts, wherein the two limiting rods and the two supporting rods are used for connecting the four first steel structural components to form a quadrangle; the moving parts are fixedly connected with the supporting rods for moving the supporting rods in a length direction of the limiting rods; the second connecting assembly comprises four second steel structural components; and each first steel structural component is connected with one corresponding second steel structural component through a flexible connector. The hanger is adjustable in hanging point distance, can be used for hoisting large-section steel truss girders with different lifting lug distances, is strong in universality and is good in economical efficiency.

Description

technical field [0001] The invention relates to the hoisting field of steel truss girders, in particular to a hoisting tool and a hoisting method for hoisting large-segment steel truss girders. Background technique [0002] The construction of steel truss girders at sea, due to the changeable climate, strong winds, high waves, and rough waves, if the conventional scattered erection is adopted, the transportation and hoisting of steel truss girders will be affected by the environment, and it will be difficult to assemble and align. Coupled with the large quantity, it will greatly affect the construction period and safety quality. Therefore, long bridges erected on the sea generally consider factory, integrated, and assembled construction, that is, steel truss girders with whole holes or large sections (more than 2 internode lengths) are manufactured in the factory first, and then transported to the bridge site. Use a large floating crane for overall hoisting and erection. ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): B66C1/12
CPCB66C1/12
Inventor 沈大才徐烨马晓东徐启利潘东发潘博顿琳胡环姚森胡军毛伟琦吴方明涂满明马涛张爱花
Owner CHINA RAILWAY MAJOR BRIDGE ENG GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products