Installation construction method of super-high and super-long suspender curtain wall
A construction method and boom technology, which are applied to walls, building components, buildings, etc., can solve the problems of high vertical drop, large horizontal span, and difficulty in the installation of boom curtain wall support systems and surface materials, so as to ensure the quality of installation. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] The technical solutions in the embodiments of the present invention will be described clearly and in detail below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0020] Such as Figure 1-4 Shown: a super-high super-long boom curtain wall installation method, the method includes the following steps:
[0021] Measurement and setting out: use the curtain wall tolerance to set up a reference reference axis, and after repeated checks, establish it as an auxiliary reference axis. According to the reference point and line of the general contractor, consider the error caused by temperature difference and uneven grou...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 