Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

114results about How to "Solve installation problems" patented technology

Layer added steel framework column base node on top of multi-layer concrete framework structure and construction method thereof

InactiveCN103669598AFacilitate adjustment and determinationSolve installation problemsBuilding constructionsReinforced concrete columnRebar
The invention provides a layer added steel framework column base node on the top of a multi-layer concrete framework structure and a construction method thereof; the column base node comprises a section of concrete column head (5) which is cast on an original reinforced concrete column (1) and the top of a beam (2) which is connected with the original reinforced concrete column, has an enlarged cross section and is connected with a steel column (9), and a ring beam (4) which is cast together with the concrete column head (5); an anchor bolt (7) and a longitudinal bar (3) are buried in the concrete column head (5); the root of the longitudinal bar (3) is implanted into the reinforced concrete column (1); a bottom plate (6) at the bottom of the steel column (9) is fixed with the concrete column head (5) through the anchor bolt (7); an outsourced reinforced concrete column (8) at the bottom of an outsourced steel column is cast on the top of the concrete column head (5). According to the layer added steel framework column base node on top of the multi-layer concrete framework structure and the construction method thereof, the connection rigidity of a column base is improved, so that the internal force which is produced by the added layer of an upper steel structure is effectively transmitted to an original structure, meanwhile the connection integrity on an interface between new and old structures is improved, and the anti-seismic performance of the structure is improved.
Owner:ANHUI TIANZHU CONSTR GRP +1

Submarine pipeline flange underwater abutting joint installation method

The invention discloses a submarine pipeline flange underwater abutting joint installation method. A main flange connecting device is installed on the abutting joint end of a submarine pipeline A, an auxiliary flange connecting device is installed on the abutting joint end of a submarine pipeline B, the submarine pipeline A to be butted and the submarine pipeline B to be butted are connected together through the main flange connecting device and the auxiliary flange connecting device, the negative influence of the marine condition on underwater flange connection can be removed, the influence of ship shake on the movement of the submarine pipeline A and the submarine pipeline B can be removed, underwater adjusting steps of a diver can be reduced, the diver can adjust the positions of the submarine pipeline A and the submarine pipeline B conveniently, the underwater operation difficulty degree of the diver can be reduced, the underwater operation time of the diver can be shortened, the case that flanges get close to each other in an aligned manner can be ensured, the force applied to a gasket of each flange is consistent, uniform deformation is generated, and the leakproofness of the flanges can be improved. The flange connection quality can be improved, the operating time of the support ship can be saved, the construction period of the whole fleet can be shortened, the working efficiency is improved, and the installation cost is saved.
Owner:CNOOC ENERGY TECH & SERVICES

Electromagnetic stirring and flow control device technology for multi-mode bar plate continuous casting crystallizer

The invention relates to an electromagnetic stirring and flow control device technology for multi-mode bar plate continuous casting crystallizer, which includes respectively setting the inner arc induction apparatus and outer arc induction apparatus which are from electromagnetic stirring induction apparatus at two sides of the crystallizer copper plate, and molten steel passing through the induction apparatus and crystallizer copper plate. The inner arc induction apparatus and outer arc outer arc induction apparatus respectively set at least four magnetic field zone, and the magnetic field size and field direction of each magnetic field zone can be adjusted independently, and by changing the setup of magnetic field, single rotation stirring schema, electro-magnetism slowdown schema, electro-magnetism speedup schema, two zones rotation stirring schema and four zones rotation stirring schema can be combined into. The invention tentatively manufactures one set of multi-mode bar plate continuous casting crystallizer electromagnetic stirring and flow control device by employing slotless and magnetic shading technology, which well accounts for the difficulty of installation, greatly diminishes the alteration cost caused by increasing electromagnetic stirring, and also greatly increases the metallurgy effect of bar plate crystallizer electromagnetic stirring.
Owner:HUNAN ZHONGKE ELECTRIC

Layer-by-layer overhanging structure lifting method

The invention relates to a layer-by-layer overhanging structure lifting method economically and efficiently solving the problem of construction of a large overhanging structure which needs to be simultaneously constructed with buildings both arranged above and below the large overhanging structure within an overhanging projection range. The layer-by-layer overhanging structure lifting method is characterized in that the integral large overhanging structure is sectioned layer by layer according to structural feature composition and lifting mechanical property; then the lowest section of an overhanging sectioned structure which is sectioned layer by layer and relative bonding floor steel beams are combined into a plurality of lifting unit bodies after stable reinforcement measures are taken; and the lifting unit bodies are lifted to be installed in place and then stabilized by utilizing the stresses of self structures without arranging large-size supports on lower parts. The layer-by-layer overhanging structure lifting method can save a large quantity of construction supports and reduce the cost; the work of the building positioned below the overhanging structure is not influenced during the construction of the overhanging structure, therefore a construction operation face is created, and construction progress is accelerated.
Owner:SHANGHAI MECHANIZED CONSTR GRP

Device and method for installing deep sea submarine storage tank

The invention discloses a device and a method for installing a deep sea submarine storage tank and belongs to the technical field of ocean engineering. The device and the method solve the problem of deep-sea installation of large submarine structures such as submarine storage tanks beyond joint capability of conventional floating crane lifting and rope capacity. The device for installing the deep sea submarine storage tank is composed of a lifting frame, a heaving compensator, a retractable winch, an oil supply ship and a packing fluid charging and discharging pipeline, the storage tank is filled with light liquids such as oil during installation on the sea, and the heaving compensator is used for reducing the additional inertia force caused by shaking of ships. By the aid of the device and the method, the problem that large facilities with dead loads exceeding kilotons can not be installed in the deep sea in the past is solved through reasonable combination of existing devices; the automatic balance between pressures inside and outside the tank is achieved through oil filling, and the structural design is easy to implement; and the heaving compensator is connected in series to conduct hoisting operations, so that the influence of environmental factors on devices such as floating cranes during installation of large underwater facilities can be reduced.
Owner:CHINA PETROLEUM & CHEM CORP +1

Dust concentration image collecting device and collecting method

The invention discloses an image collecting device and collecting method capable of collecting incident light, scattered light and transmission light information about dust concentration. The image collecting device comprises a light emitter, a light splitter and a light collector, wherein the light splitter splits probe light emitted from the light emitter into transmission light and reflected light, the light collector collects the reflected light and the transmission light penetrating through dust and comprises an optical fiber branch circuit, an optical fiber main circuit, an optical fiber coupler, a collection lens and a CCD camera, the optical fiber branch circuit is arranged at an exit port of the reflected light, the optical fiber main circuit is arranged at an exit port of the transmission light, light outlets of the optical fiber branch circuit and the optical fiber main circuit are connected to an inlet of the optical fiber coupler, and the collecting lens and the CCD camera are connected to an outlet of the optical fiber coupler sequentially. According to the device, the design complexity of the incident light, scattered light and transmission light collecting device is simplified, besides, the measurement accuracy of the incident light, scattered light and transmission light information is improved, and measurement signals can be collected in real time on line.
Owner:SOUTHEAST UNIV

Installation method of semi-submersible barge crawler crane offshore large wind power generator

The invention discloses an installation method of a semi-submersible barge crawler crane offshore large wind power generator, and belongs to the technical field of offshore wind power generator installation. The installation method comprises the following steps that firstly, a semi-submersible barge is transformed, upper box type beams and lower box type beams which are used for supporting a crawler crane are additionally arranged to form a crane supporting platform, the crawler crane is installed on the platform, eight hydraulic jacks are arranged on the lower box type beams of two crawler belts of the crawler crane to form a semi-submersible barge crawler crane, and a pulling rod supporting device is further arranged at the front part of a pulling rod of the crawler crane; and before a wind turbine tower cylinder is installed, the semi-submersible barge crawler crane is firstly moved to an installation position, the lifting rod supporting device of the crawler crane is loosened, thesemi-submersible barge is fixed at the bottom, the crawler crane is finely adjusted to a horizontal position by using the eight hydraulic jacks, and then the semi-submersible barge crawler crane is used for being matched with a lifting small floating crane to complete the assembly and installation of the fan tower cylinder, an engine room and an impeller. Therefore, the problem of installation ofthe offshore large wind power generator is solved, the installation and transportation efficiency is improved, the installation cost is greatly reduced, and the construction safety is ensured.
Owner:CHINA MCC17 GRP

Charging device and charging method of vehicle-mounted navigator

InactiveCN103587483ASolve the inconvenience caused by the long-term need to plug in the power supply of the car cigarette lighterSolve aestheticsBatteries circuit arrangementsSecondary cells charging/dischargingUSBSatellite navigation
The invention discloses a charging device of a vehicle-mounted navigator. The charging device of the vehicle-mounted navigator comprises a plurality of buckles, a body, a first photovoltaic panel, a second photovoltaic panel and a first USB interface. An original rearview mirror is arranged between the charging device and the vehicle-mounted navigator. The buckles are arranged on the rear portion of the body and are matched with hooks on the rear portion of the vehicle-mounted navigator, so that the original rearview mirror is fixed between the charging device and the vehicle-mounted navigator. The first photovoltaic panel and the second photovoltaic panel are both in a foldable type and are arranged on the two sides of a fixed crank and a ball journal of the original rearview mirror respectively, the first photovoltaic panel and the second photovoltaic panel are in an L shape, and the first photovoltaic panel and the second photovoltaic panel are fixed on the body in a pivoted connection mode and can be unfolded to work in a rotating mode and can be packed up to be stored in a folding mode. The first USB interface is arranged on the body and is connected with a second USB interface arranged on the vehicle-mounted navigator through a USB connecting wire. The charging device of the vehicle-mounted navigator solves the technical problems of power line wiring and inconvenient mounting in the power supply process of an existing vehicle-mounted satellite navigation terminal.
Owner:HUBEI UNIV OF TECH

Vector propelling device for two-shaft linkage propeller for airship

The invention provides a vector propelling device for a two-shaft linkage propeller for an airship. The vector propelling device comprises an outer supporting frame, a yaw mechanism part and a pitching mechanism part. The outer supporting frame and a tail cabin or a hard tail supporting structure of the airship are connected depending on locating screw holes distributed in a side board of the outer supporting frame, so that the outer supporting frame is arranged at the tail portion of the airship. The yaw mechanism part and the outer supporting frame are fixedly connected. The pitching mechanism part is embedded in the yaw mechanism part to be fixedly connected with an inner rotary frame of the yaw mechanism part. A propeller of the pitching mechanism part rotates at a high speed synchronously along with a propelling motor, thrust is generated, the yaw mechanism part takes charge of the orientation yaw of the propeller, the pitching mechanism part takes charge of the posture adjustment of the propeller, and auxiliary propelling, yaw and pitching of the airship can be achieved synchronously. Two-shaft linkage is adopted in the vector propelling device, closed-loop control is conducted, the rotation angle is accurately controlled, the weight is reduced, an installation problem is solved, the flight risks and energy consumption are reduced, and climbing, flat flight, fixed-point flight and landing of the airship are achieved successfully.
Owner:ACAD OF OPTO ELECTRONICS CHINESE ACAD OF SCI

Installation structure of wallboard

The invention relates to an installation structure of a wallboard, which comprises a wallboard, a wall body and a wallboard mounting buckle, wherein the wallboard comprises a first connecting end anda second connecting end; the first connecting end is provided with a first slot and the second connecting end is provided with a second slot; the wallboard mounting buckle comprises a first convex strip, a second convex strip, a first connecting edge, a second connecting edge, a third connecting edge, a mounting plate and a decorative plate; during installation, the second connecting end of the wallboard faces upwards, the first connecting end faces downwards, the two wallboards which are adjacent up and down are connected through the wallboard mounting buckle, the second convex strip of the wallboard mounting buckle is inserted into the second slot of the lower wallboard, the inner arm of the second slot is positioned in a second clamping groove, the outer arm of the second slot is positioned in the fourth clamping groove of the wallboard mounting buckle; the inner arm of the first slot of the upper wallboard is inserted into the first clamping groove of the wallboard mounting buckle,and the outer arm of the first slot is positioned in the third clamping groove of the wallboard mounting buckle. According to the invention, the wallboards which are adjacent up and down are connected through the wallboard mounting buckle, the installation process is simplified and the shortening of the installation period is facilitated.
Owner:ZHEJIANG HUAXIAJIE MACROMOLECULE BUILDING MATERIAL

Shared parking management system

InactiveCN110930759AImprove experienceStop blindly looking for parking spacesTicket-issuing apparatusTransmission systemsSimulationUncrewed vehicle
The invention discloses a shared parking management system. Remote monitoring and management of stereo garage parking spaces, planar parking spaces and roadside parking spaces are realized. Accordingto the system, the stereo garage does not need to be on duty and operates fully automatically, safely and reliably, publishing, drainage and charging management of parking space information includingstereo parking spaces, planar parking spaces and roadside parking spaces are achieved, the time-sharing sharing function of the parking spaces is provided, the use efficiency of parking space resources is improved, and parking space sharing persons can gain benefits; the shared parking management system comprises a cloud platform, a mobile terminal, a stereo garage, a parking space lock, an unmanned aerial vehicle for patrolling roadsides and the like, a user uses the mobile terminal to be connected to the cloud platform, parking space reservation, parking, vehicle taking and payment are achieved, and autonomous control of the mobile terminal is achieved in the whole process. According to the invention, the operation cost of the stereo garage, the roadside parking spaces and the parking lot is effectively reduced, the turnover rate of the parking spaces and the experience feeling of users are improved, the shared ecology of the plane and the stereo parking spaces is established, and great contribution is made to relieving the parking difficulty.
Owner:PARKSHEN SMART PARKING MANAGEMENT CO LTD +1

Central air supply, heat dissipation and noise reduction system for motor group

The invention relates to a central air supply, heat dissipation and noise reduction system for a motor group. The central air supply, heat dissipation and noise reduction system for the motor group comprises motors, noise reduction rooms, draught fans and air pipes, wherein the noise reduction rooms are arranged in a factory or each workshop, the draught fans which are used for centrally supplying air are installed in the noise reduction rooms, the wall, corresponding to an air outlet of each draught fan, of each noise reduction room is provided with a ventilation opening, the ventilation opening is communicated with a main air pipe arranged on a support in a suspended mode, a plurality of branch air pipes are distributed and arranged on the main air pipe, and the air outlet of each branch air pipe is communicated with the air inlet formed in each fan housing of the motor respectively. The central air supply, heat dissipation and noise reduction system for the motor group has the advantages of being suitable for the central air supply, heat dissipation and noise reduction for the motor group, capable of effectively improving the cooling and heat dissipation effects of the motor, obvious in noise reduction effect, and capable of enabling the noise of the motor group in operation to be meet the requirement of being less than or equal to 85dB (A). The utilized air pipes are all flexible air pipes which are made of fiber fabric to supply the air, the cost is greatly lowered, the air supply effect can be fully met, and the energy-saving effect is remarkable.
Owner:WOLONG ELECTRIC NANYANG EXPLOSION PROTECTION GRP CO LTD

Interference magnitude simulation fixture for bearing installation

The invention relates to an interference magnitude simulation fixture for bearing installation. The interference magnitude simulation fixture comprises an expanding shaft type fixture which enables an inner ring of a test bearing to be pressed to deform and an expanding sleeve type fixture which enables an outer ring of the test bearing to be pressed to deform, and the test bearing is arranged between the expanding shaft type fixture and the expanding sleeve type fixture; the outer ring and the inner ring of the test bearing are respectively pressed by using the expanding sleeve type fixture and the expanding shaft type fixture, when an elastic expanding sleeve and an elastic core shaft have elastic deformation at the surface, and the inner ring and the outer ring of the bearing are stressed and change along with the deformation, so that actual operating conditions of bearing assembly are simulated, the operating performance of the bearing under different interference conditions is analyzed through testing operating parameters of the bearing under the simulated working conditions, a bearing with the friction moment and the clearance being appropriate after installation is selected under the premise of given magnitude of interference, and thus problems of bearing installation at present are solved.
Owner:JIANGXI HONGDU AVIATION IND GRP

Combined tower crane for roof construction and construction method thereof

InactiveCN105731271ASolve installation problemsSolve technical problems in hoisting constructionCranesEngineeringMechanical equipment
The invention relates to a combined tower crane for roof construction and a construction method thereof and belongs to the technical field of architectural engineering. The combined tower crane for roof construction and the construction method thereof are used for solving the technical problem that a conventional tower crane and other mechanical equipment cannot be used for hoisting construction normally under the condition that the structure of a roof is complex. The combined tower crane comprises a first roof surface crane body and a second roof surface crane body which are arranged in parallel. The first roof surface crane body is installed on a roof through a supporting frame. The second roof surface crane body is connected with the roof through a tower crane foundation. The tower crane foundation comprises a tower body and foundation steel beams. The upper end of the tower body is in rotary connection with the second roof surface crane body. The lower end of the tower body is in fixed connection with the foundation steel beams. The foundation steel beams are fixedly connection with the roof. The construction method comprises the steps that 1, the first roof surface crane body is fixedly installed in the position, above a core barrel, of the roof through the supporting frame; 2, the foundation steel beams are fixedly installed on the roof, and the tower body is fixedly installed over the foundation steel beams; and 3, the second roof surface crane body is lifted through the first roof surface crane body, so that a lower rotation body at the bottom of the second roof surface crane body is in rotary connection with an upper rotation body of the tower body.
Owner:SHANGHAI MECHANIZED CONSTR GRP

Point-contact-type fire detection alarm

InactiveCN108922107ASolve the problem of one-to-one correspondence connectionAvoid the nowhere placement problemCasings/cabinets/drawers detailsFire alarm smoke/gas actuationEngineeringFire detection
The invention discloses a point-contact-type fire detection alarm, and relates to the technical field of fire-fighting and warning. The point-contact-type fire detection alarm comprises a base shell and a fixed shell. Clamping devices are fixedly connected to two sides of the bottom of the inner wall of the fixed shell, and the fixed shell is fixedly connected with the base shell by the clamping devices. Supporting bases are fixedly connected to the top of the inner wall of the base shell, and a circuit board assembly is fixedly connected to the bottoms of the supporting bases. A fixing plateis fixedly connected to the inner wall of the base shell, and elastic contacts are fixedly connected to the bottom of the circuit board assembly. A smoke sensor is fixedly connected to the bottom center of the inner wall of the fixed shell, and a battery compartment is fixedly connected to one side of the bottom of the inner wall of the fixed shell. The top of the fixed shell is fixedly connectedwith a panel, and fixed contacts are fixedly connected to the surface of the panel and located at the corresponding positions of the elastic contacts. The point-contact-type fire detection alarm solves the problem that communication connection lines need to be connected in a one-to-one corresponding mode, installation is convenient, and the problem of no place for placing the communication connection lines is avoided.
Owner:深圳市智安城科技有限公司

Installation method of gear root strain gauge with narrow clearance

The invention discloses an installation method of a gear root strain gauge with a narrow clearance. The method comprises the following steps: determining a maximum stress position of a root of a gearto be installed as an installation position; preparing a strain gauge, wherein the space dimension of the strain gauge is matched with the clearance of the gear to be installed; polishing and cleaningthe installation position of the root of the gear to be installed; attaching and pressing the strain gauge at the installation position; installing a terminal for connecting a test lead and a lead for the strain gauge to a non-working surface, of a gear to be installed, adjacent to a strain gauge installing gear tooth to be installed; respectively arranging leads on both sides of the strain gaugealong the bottom of a slot; folding back the lead away from one side of the terminal, or the lead away from the terminal side passing out from a vibration damping hole to contact with the lead of theother side at the terminal and fixedly connecting with the terminal, so that the lead and the lead, the lead and the strain gauge doing not overlap each other. According to the installation method ofthe gear root strain gauge with the narrow clearance, the problem that the strain gauge is difficult to install in the gear root strain gauge with the narrow clearance is solved.
Owner:AECC HUNAN AVIATION POWERPLANT RES INST

A window sash connector

The invention relates to a sash connecting piece. The sash connecting piece comprises a main body 1 and three branches, the top of the main body extends towards one side to form a branch A which forms an angle of 90 degrees with the main body, the bottom of the main body also extends towards one side to form a branch B which forms an angle of 90 degrees with the main body, the extension direction and the length of the branch B are identical with those of the branch A, the branch A, the branch B and the main body form a U-shaped groove, the middle-upper portion of the main body extends towards the other side to form a branch C which forms an angle of 90 degrees with the main body, the outer end of the branch C is bent, the top of the outer end of the branch C is level with the top of the main body, and the branch C and the main body form a C-shaped groove. The sash connecting piece has the advantages that due to the facts that a structure of the main body and the three branches are utilized in the sash connecting piece and the U-shaped groove and the C-shaped groove are formed respectively, the installation problem of shutters and window sashes and the installation problem of glass and the window sashes are effectively solved, and the sash connecting piece is integrally formed, simple in structure and low in production costs.
Owner:浙江瑞明节能门窗技术有限公司

An installation method for a main air-discharge pipe of a sintering machine

The invention relates to an installation method for a main air-discharge pipe of a sintering machine. The method includes the following steps: the first step: checking the installation elevation and levelness of a bearing of the main air-discharge pipe; the second step: fully arranging sliding rails on the bearing of the main air-discharge pipe; the third step: arranging winches in a machine head,a tail and the middle ground of a factory building; the fourth step: installing the pipe from the machine head to the middle section of the factory building; the fifth step: slipping the pipe hung onthe pipe support to the correct installation position in segment by utilizing the machine head ground position winch; the sixth step: repeating the fourth step to the fifth step and performing assembling and welding on two pipes in segment; the seventh step: lifting the spliced two sections of the pipe to a height of 200-500 mm; the eighth step: repeating the fourth step to the seventh step, andinstalling and then group welding all sections of the pipe from the machine head to the middle position of the factory building; the ninth step: installing the section of the pipe from the middle position of the factory building to the tail, and repeating the fourth step to the eighth step and splicing the whole pipe into an integral body in segment. The problem of the installation of the main air-discharge pipe in the restricted space is solved, and the rapid, concise and safety effect in the installation process is realized.
Owner:CHINA MCC20 GRP CORP +1

Partition wall and wall body mounting structure

The invention discloses a partition wall and a wall body mounting structure. A mounting groove is formed in the top of the partition wall, an elastic support is arranged in the mounting groove, the elastic support is vertically arranged, and the top of the elastic support protrudes out of the mounting groove and is used for being elastically connected with a building ceiling located at the top of the partition wall. The wall body mounting structure comprises the building ceiling, connecting pieces and the partition wall, a gap is formed between the top of the partition wall and the building ceiling, the top of the elastic support abuts against the building ceiling and is in a compressed state, and the connecting pieces are fixed to the building ceiling and arranged on the two sides of the partition wall and used for guaranteeing the lateral stability of the partition wall. The invention relates to the field of buildings, and provides the partition wall and the wall body mounting structure. The elastic support is used for enabling the top to be elastically connected with the building ceiling, internal stress in the height direction of the partition wall is further eliminated, and cracks of the partition wall are avoided; and meanwhile, the elastic support can eliminate vibration of the partition wall, the vibration reduction effect is achieved, and the wall body is prevented from being damaged by vibration.
Owner:CHINA NAT BUILDING MATERIALS TECHCAL INNOVATION & RES INST LIMITED
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products